Canada: source-linked stories on projects, data and official announcements. A story is listed when its record names the country; locations are never inferred. (Page 6 of 41)
Mining engineers with Newmont Corporation and the Tahltan Central Government completed the 1,200-meter exploration decline at the Red Chris mine near Dease Lake on 3 November 2026, advancing block-cave recovery of 4.5 million tons of copper and 7 million ounces of gold.
Mining Association of British Columbia4 min read Data included
Oceanographers at Ocean Networks Canada and the University of Victoria deployed an upgraded fiber-optic seafloor junction box at 300 meters depth in the Strait of Georgia on 3 November 2026, streaming continuous seismic, acoustic, and ocean acidification telemetry.
Marine engineers with BC Ferries commenced full all-electric Island Class ferry sailings between Nanaimo Harbour and Gabriola Island on 3 November 2026 using 2.5-megawatt shoreside robotic arms that recharge 2,000-kWh battery banks during 12-minute stops.
BC Transit and the City of Prince George commissioned a 15-megawatt automated bus depot charging facility on 3 November 2026 featuring 12 overhead pantograph fast-chargers and 24 plug-in DC units for northern zero-emission transit operations.
The Squamish-Lillooet Regional District and BC Transit launched the Sea-to-Sky Regional Express bus service on 3 November 2026, operating 16 daily round trips along Highway 99 linking downtown Vancouver, Squamish, Whistler, and Pemberton.
Coastal biologists with the Pacific Salmon Foundation and Musqueam Indian Band breached historic training jetties at Sturgeon Bank in Richmond on 3 November 2026, reconnecting 150 hectares of tidal marsh rearing habitat for juvenile Chinook, Coho, and chum salmon.
Fisheries and Oceans Canada4 min read Data included
Heiltsuk, Kitasoo Xai'xais, and Nuxalk Indigenous Guardians deployed an AI-monitored bioacoustic and microclimate sensor network in the old-growth canopy of the Great Bear Rainforest near Bella Bella on 3 November 2026 to track marbled murrelet and northern goshawk populations.
Forestry crews with the City of Kamloops and BC Wildfire Service completed mechanical thinning across 300 hectares of ponderosa pine and Douglas-fir southwest of Kamloops on 3 November 2026, cutting surface fuel loads from 40 tons per hectare to under 8 tons.
Geotechnical crews with the BC Ministry of Transportation secured 15,000 square meters of high-tensile steel rockfall mesh and 300 deep rock anchors along Highway 3 over Kootenay Pass on 3 November 2026 in a $12 million wildfire slope stabilization project.
BC Ministry of Transportation4 min read Data included
Aquatic biologists with the Freshwater Fisheries Society of BC and Carrier Sekani elders released 1,200 PIT-microchipped year-old juvenile white sturgeon into the Nechako River at Vanderhoof on 3 November 2026 to restore the endangered population.
Freshwater Fisheries Society of BC4 min read Data included
Hydrogeologists with the Okanagan Basin Water Board released a three-dimensional digital model in Kelowna on 3 November 2026 mapping 85 interconnected alluvial aquifers across the 200-kilometer Okanagan Valley using data from 2,500 observation wells.
Okanagan Basin Water Board4 min read Data included
Port engineers commissioned two 6.6-kilovolt marine shore-power berths at the Centerm container terminal in Burrard Inlet on 3 November 2026, allowing docked vessels to shut down auxiliary diesel engines and cut berth emissions by over 95 percent.