Brazil seeks comment on targets for Amazon isolated power systems
The energy ministry proposed 2030 and 2035 reductions in emissions, fossil-fuel use and generation costs; final targets remain for the national energy council to decide.
Follow global economy, business, finance, energy, climate and public affairs through original sources, sourced data and context.
The energy ministry proposed 2030 and 2035 reductions in emissions, fossil-fuel use and generation costs; final targets remain for the national energy council to decide.
In ADIPEC’s 2026 report, 85% of more than 1,800 energy leaders said the sector was more attractive for investment than five years earlier.
A March prefectural order allows the SEDA site in Maine-et-Loire to continue and expand operations; a new non-hazardous waste cell entered service in September.
The Italian energy group reported higher upstream output and a stronger 2026 cash-flow outlook after its third-quarter results. It also increased its buyback plan and outlined developments across oil, gas, refining and transition businesses.
The three-day meeting has brought together more than 1,200 delegates, including over 150 foreign participants.
Staff said the single-turbine project on the Buckeye canal meets conduit hydropower criteria.
The European Investment Bank will lend €20 million to Tauragė municipality in western Lithuania for planned sustainable mobility, energy-efficiency, renewable-energy and public-infrastructure projects.
The Official Gazette published on 2026-10-20 an administrative prior and construction authorization for the Hibridación Los Belos battery storage module in La Muela and Muel, Zaragoza. Its installed power is 26.74 MW, and it is to be hybridized with an existing solar facility.
The Official Gazette published on 2026-10-20 an administrative prior and construction authorization for the Solaria-Santiz I battery storage module in Valdelosa, Salamanca. Its installed power is 19.993 MW, and it is to be hybridized with an existing solar facility.
The Official Gazette published on 2026-10-19 an administrative prior and construction authorization for the Hibridación Los Arcos battery storage module in Andorra, Teruel. Its installed power is 26.74 MW, and it is to be hybridized with an existing solar facility.
The Official Gazette published on 2026-10-19 an administrative prior and construction authorization for the Tesouro Storage battery storage module in As Pontes de García Rodríguez, A Coruña. Its installed power is 17.5 MW, and it is to be hybridized with an existing wind facility.
The Official Gazette published on 2026-10-20 an administrative prior and construction authorization for the BESS Hibridación FV Teruel battery storage module in Azaila, Teruel. Its installed power is 27.64 MW, and it is to be hybridized with an existing solar facility.