Solomon Islands trains 42 Guadalcanal health workers for emergencies
A five day course focused on keeping clinics operating through floods, cyclones and landslides. Earlier releases reported training cohorts of 38 in Temotu and 36 in Makira.
Follow global economy, business, finance, energy, climate and public affairs through original sources, sourced data and context.
A five day course focused on keeping clinics operating through floods, cyclones and landslides. Earlier releases reported training cohorts of 38 in Temotu and 36 in Makira.
UNDP reports an AIB and 77 Construction memorandum for a Herat wind project with a planned 40 MW initial stage and an ACGF guarantee commitment. The release gives no financing terms or construction award.
The US$488 million total includes US$241 million in expected commercial financing. Area and employment figures are forward looking.
The Prince Rupert Port Authority and Metlakatla Development Corporation commissioned Phase 1 of the $750 million, 400-acre Ridley Island Export Logistics Platform on 3 November 2026 with 10 kilometers of unit-train loop tracks connected to Fairview Terminal.
Heavy rigging crews at BC Hydro's Revelstoke Generating Station lowered a 450-tonne Francis turbine rotor into the sixth generating bay on 3 November 2026 under a $580 million expansion raising peaking capacity by 500 megawatts to 3,000 megawatts.
Oceanographers at Ocean Networks Canada and the University of Victoria deployed an upgraded fiber-optic seafloor junction box at 300 meters depth in the Strait of Georgia on 3 November 2026, streaming continuous seismic, acoustic, and ocean acidification telemetry.
Forestry contractors and Wet'suwet'en crews completed a 250-hectare shaded wildfire fuel break along the mountain slopes surrounding Smithers and the Bulkley Valley on 3 November 2026, thinning dense balsam and pine understory fuels.
Shipbuilders at Seaspan's North Vancouver shipyard hoisted the first 300-ton EH47 steel hull block into the slipway on 3 November 2026 for Canada's 150-meter Polar Icebreaker, CCGS John G. Diefenbaker.
The Campbell River Community Forest distributed a record $1.8 million municipal dividend on 3 November 2026 after independent registries verified 85,000 tons of carbon dioxide sequestered across its 5,000-hectare forestry tenure.
Provincial negotiators and Ktunaxa, Secwépemc, and Syilx Okanagan leaders finalized domestic benefit-sharing protocols in Castlegar on 3 November 2026 under the modernized Columbia River Treaty, securing $2.6 billion in hydropower benefits over 20 years.
FortisBC and the City of Kelowna commissioned Phase 3 of the downtown Kelowna district energy network on 3 November 2026, extracting thermal energy from 30 million liters of daily treated municipal effluent across a two-kilometer underground loop.
The Nature Conservancy of Canada and Environment Canada secured permanent legal protection on 3 November 2026 for 800 hectares of marshes and riparian cottonwood forests in the upper Columbia River Valley near Golden, shielding over 250 migratory bird species.