NEWSVERUM / Global briefing
Puits et forage · Newsverum
14 storiesFollow global economy, business, finance, energy, climate and public affairs through original sources, sourced data and context.
Water utility engineers with the Sunshine Coast Regional District commissioned the expanded Church Road aquifer water treatment plant in Sechelt on 3 November 2026, delivering 5 million liters of UV-disinfected drinking water daily.
Transport Canada says it will provide up to C$125 million from the C$5 billion Trade Diversification Corridors Fund to develop a new public marine terminal in Sault Ste. Marie, Ontario. Led by the Hamilton-Oshawa Port Authority, the project targets annual cargo capacity above 3.5 million metric tonnes by 2031.
Metrolinx civil engineering crews successfully hoist prefabricated steel bridge truss over the Don Valley Parkway, connecting downtown subway tunnels to east end communities.
Marine contractors with the Port Alberni Port Authority began driving steel pipe piles to modernize Berth 3 on 3 November 2026, deepening the terminal for Handymax cargo vessels and installing a 100-ton mobile harbor crane.
The Prince Rupert Port Authority and Metlakatla Development Corporation commissioned Phase 1 of the $750 million, 400-acre Ridley Island Export Logistics Platform on 3 November 2026 with 10 kilometers of unit-train loop tracks connected to Fairview Terminal.
Subway engineering teams with TransLink energized the 1,500-volt DC third-rail traction system and began automated train clearance testing on 3 November 2026 along the 5.7-kilometer Broadway Subway extension from VCC-Clark to Arbutus Station in Vancouver.
Marine engineers with BC Ferries commenced full all-electric Island Class ferry sailings between Nanaimo Harbour and Gabriola Island on 3 November 2026 using 2.5-megawatt shoreside robotic arms that recharge 2,000-kWh battery banks during 12-minute stops.
BC Transit and the City of Prince George commissioned a 15-megawatt automated bus depot charging facility on 3 November 2026 featuring 12 overhead pantograph fast-chargers and 24 plug-in DC units for northern zero-emission transit operations.
The Squamish-Lillooet Regional District and BC Transit launched the Sea-to-Sky Regional Express bus service on 3 November 2026, operating 16 daily round trips along Highway 99 linking downtown Vancouver, Squamish, Whistler, and Pemberton.
Geotechnical crews with the BC Ministry of Transportation secured 15,000 square meters of high-tensile steel rockfall mesh and 300 deep rock anchors along Highway 3 over Kootenay Pass on 3 November 2026 in a $12 million wildfire slope stabilization project.
Highway construction crews with the BC Ministry of Transportation opened a $140 million, four-kilometer four-lane section of the Trans-Canada Highway east of Kamloops on 3 November 2026 with concrete median barriers and a grade-separated interchange.
City of Kelowna and airport officials inaugurated the $90 million Phase 1 terminal expansion at Kelowna International Airport on 3 November 2026, adding 5,500 square meters of passenger space and a six-lane CATSA security hall.