Teck informa de un mayor beneficio trimestral y producción de cobre
Teck informó el 29 de octubre de ingresos no auditados de 4.517 millones de dólares canadienses en el tercer trimestre de 2026, frente a 3.385 millones un año antes.
Las etiquetas temáticas pueden ser sugerencias y no equivalen a una confirmación editorial.
Teck informó el 29 de octubre de ingresos no auditados de 4.517 millones de dólares canadienses en el tercer trimestre de 2026, frente a 3.385 millones un año antes.
Eurostat informó el 29 de octubre de que la UE generó 765 millones de toneladas de residuos en 2024 al excluir los principales residuos minerales.
Egypt’s petroleum ministry and the World Bank Group announced a national charter aiming to raise mining’s share of GDP to 6%. The statement outlined reform and investment priorities but gave no current baseline, timetable or Egypt-specific financing amount.
The company approved a brownfield project near Weipa that is intended to add 20 million tonnes of annual bauxite capacity, with first output targeted for 2029.
Foremost Clean Energy said it agreed to sell Denison Mines a 31% interest in the GR and Blackwing properties and form two exploration joint ventures. The transaction had not closed.
Sudan’s minerals minister, Nour Al-Daim Taha, asked Nigeria’s RMRDC for technical assistance and research cooperation. He also proposed a Minerals Investment Forum in Sudan for October 2027; no agreement, funding amount or confirmed project was announced.
Mineral Resources reported record Mining Services volumes of 103 million tonnes and record attributable lithium sales of 170,000 dry tonnes of SC6 in Q1 FY27.
Whitehaven’s September-quarter report showed 11.0 million tonnes of managed run-of-mine production and 6.0 million tonnes of equity sales of produced coal.
The company reported a high-grade individual soil sample at Boa Vista and separate surface anomalies at the undrilled Encachoeirado target; neither establishes a mineral resource.
Decree 49,298 keeps existing state procedures in place while federal licensing categories are clarified and sets timelines for technical terms, study checks and licence-holder changes.
ANM described mine-structure inspections and coordination with civil defence; its three-hour field response is a stated target, not a measured average.
The company confirmed that United Steelworkers Local 7619 had begun labour action but did not quantify its effect on copper output.