# Síria inaugura ligação ao Gasoduto Árabe e centro de treinamento

> O trecho de Homs conecta 186 quilômetros à rede existente.

- URL canônica: https://newsverum.com/pt/news/syria-opens-arab-gas-pipeline-link-and-training-center-2026
- Editora: Newsverum
- Seção: Energia
- Publicado: 2026-10-02T21:09:51+03:00
- Atualizado: 2026-10-07T00:57:07+03:00
- Período do evento ou dos dados: 2026-09-30
- Outras edições: [Türkçe](https://newsverum.com/tr/news/syria-opens-arab-gas-pipeline-link-and-training-center-2026.md), [English](https://newsverum.com/en/news/syria-opens-arab-gas-pipeline-link-and-training-center-2026.md), [العربية](https://newsverum.com/ar/news/syria-opens-arab-gas-pipeline-link-and-training-center-2026.md), [Français](https://newsverum.com/fr/news/syria-opens-arab-gas-pipeline-link-and-training-center-2026.md), [Español](https://newsverum.com/es/news/syria-opens-arab-gas-pipeline-link-and-training-center-2026.md), [Deutsch](https://newsverum.com/de/news/syria-opens-arab-gas-pipeline-link-and-training-center-2026.md)

A SANA informou a abertura de uma nova etapa do Gasoduto Árabe em Homs pela Syrian Petroleum Company. A empresa afirmou que 186 quilômetros foram conectados a cerca de 380 quilômetros de linhas existentes.

A capacidade de transmissão informada chega a 11 milhões de metros cúbicos por dia. O centro de treinamento reabilitado em Furqlus também foi reaberto. Capacidade não é uma medição do fluxo diário efetivo de gás.

## Fontes

- [SANA](<https://sana.sy/en/syria/2346979/>) (Fonte verificada: 2026-10-02; Publicado: 2026-09-30)

## Histórico de correções

- 2026-10-07T00:57:07+03:00: Este artigo recebeu edições em alemão e português, além das traduções das explicações dos dados e das correções nesses idiomas.

---

Use a URL canônica acima para citar este artigo. [Princípios editoriais e correções](https://newsverum.com/pt/editorial)
