# França seleciona 996 projetos em dois concursos solares PPE2

> O ministro selecionou projetos conforme a CRE: 125 no solo e 871 de pequena PV. As potências são 931,4 e 288,3 MWp; os preços respetivos, 61,33 e 75,48 €/MWh.

- URL canônica: https://newsverum.com/pt/news/france-cre-ppe2-solar-tender-results-ground-and-small-pv-october-2026
- Editora: Newsverum
- Seção: Energia
- País: França
- Publicado: 2026-10-15T21:30:20+00:00
- Atualizado: 2026-10-15T21:30:20+00:00
- Período do evento ou dos dados: 2026-10-09
- Outras edições: [Türkçe](https://newsverum.com/tr/news/france-cre-ppe2-solar-tender-results-ground-and-small-pv-october-2026.md), [English](https://newsverum.com/en/news/france-cre-ppe2-solar-tender-results-ground-and-small-pv-october-2026.md), [العربية](https://newsverum.com/ar/news/france-cre-ppe2-solar-tender-results-ground-and-small-pv-october-2026.md), [Français](https://newsverum.com/fr/news/france-cre-ppe2-solar-tender-results-ground-and-small-pv-october-2026.md), [Español](https://newsverum.com/es/news/france-cre-ppe2-solar-tender-results-ground-and-small-pv-october-2026.md), [Deutsch](https://newsverum.com/de/news/france-cre-ppe2-solar-tender-results-ground-and-small-pv-october-2026.md)

A CRE publicou em 9 de outubro avaliações de dois concursos distintos. O ministro designou 125 vencedores no solo e 871 na pequena PV.

A nona ronda no solo selecionou 125 projetos, 931,4 MWp e 61,33 €/MWh ponderados; candidaturas chegaram a 5.358,7 MWp face a 925 convocados. A pequena PV abrangeu projetos de 100–500 kWp: 871 projetos e 288,3 MWp a 75,48 €/MWh em média. São concursos separados e não representam geração já realizada.

## Dados

### França seleciona 996 projetos em dois concursos solares PPE2

França seleciona 996 projetos em dois concursos solares PPE2

Metodologia: Dados do comunicado e de duas decisões CRE. Rondas e preços separados; MWp é potência de pico.

| date | label | description | status |
|---|---|---|---|
| 2026-10-09 | Solar no solo, 9.ª ronda | A CRE propôs 125 projetos, 931,4 MWp e 61,33 €/MWh; candidaturas de 5.358,7 MWp para 925 convocados. | occurred |
| 2026-10-09 | Pequena PV, 2.ª ronda | Projetos de 100–500 kWp: 871 candidaturas, 288,3 MWp e média de 75,48 €/MWh. | occurred |

Fontes: <https://www.cre.fr/actualites/toute-lactualite/ppe-2-la-cre-publie-les-deliberations-relatives-a-ses-instructions-de-la-9e-periode-de-lao-ppe2-pv-sol-et-de-la-2e-periode-de-lao-ppe2-petit-pv.html>, <https://www.cre.fr/fileadmin/Documents/Deliberations/2026/260917_2026-187_AO_PV_Sol_9eP.pdf>, <https://www.cre.fr/fileadmin/Documents/Deliberations/2026/260930_2026-193_AOS_2eP.pdf> · Baixar dados: [JSON](https://newsverum.com/api/v1/articles/france-cre-ppe2-solar-tender-results-ground-and-small-pv-october-2026/data/solar-rounds?lang=pt&format=json) · [CSV](https://newsverum.com/api/v1/articles/france-cre-ppe2-solar-tender-results-ground-and-small-pv-october-2026/data/solar-rounds?lang=pt&format=csv)

## Fontes

- [Commission de régulation de l’énergie](<https://www.cre.fr/actualites/toute-lactualite/ppe-2-la-cre-publie-les-deliberations-relatives-a-ses-instructions-de-la-9e-periode-de-lao-ppe2-pv-sol-et-de-la-2e-periode-de-lao-ppe2-petit-pv.html>) (Fonte verificada: 2026-10-15; Publicado: 2026-10-09)
- [Commission de régulation de l’énergie](<https://www.cre.fr/fileadmin/Documents/Deliberations/2026/260917_2026-187_AO_PV_Sol_9eP.pdf>) (Fonte verificada: 2026-10-15; Publicado: 2026-09-17)
- [Commission de régulation de l’énergie](<https://www.cre.fr/fileadmin/Documents/Deliberations/2026/260930_2026-193_AOS_2eP.pdf>) (Fonte verificada: 2026-10-15; Publicado: 2026-09-30)

---

Use a URL canônica acima para citar este artigo. [Princípios editoriais e correções](https://newsverum.com/pt/editorial)
