# FERC preliminarily finds Zushi Renewables’ 40-kW California hydro project qualifies

> Staff said the four-turbine canal project meets criteria for conduit hydropower that does not require a licence.

- Canonical URL: https://newsverum.com/en/news/zushi-renewables-arvin-edison-canal-hydro-ferc-2026
- Publisher: Newsverum
- Section: Energy
- Country: United States
- Published: 2026-10-21T00:44:04+00:00
- Updated: 2026-10-21T00:44:04+00:00
- Event / data period: 2026-10-15
- Other editions: [Türkçe](https://newsverum.com/tr/news/zushi-renewables-arvin-edison-canal-hydro-ferc-2026.md), [العربية](https://newsverum.com/ar/news/zushi-renewables-arvin-edison-canal-hydro-ferc-2026.md), [Français](https://newsverum.com/fr/news/zushi-renewables-arvin-edison-canal-hydro-ferc-2026.md), [Español](https://newsverum.com/es/news/zushi-renewables-arvin-edison-canal-hydro-ferc-2026.md), [Deutsch](https://newsverum.com/de/news/zushi-renewables-arvin-edison-canal-hydro-ferc-2026.md), [Português](https://newsverum.com/pt/news/zushi-renewables-arvin-edison-canal-hydro-ferc-2026.md)

Zushi Renewables filed for the Arvin Edison Canal Hydrokinetic 1 project on 1 October and supplemented its notice on 13 October. Four 10-kW turbines would provide 40 kW of installed capacity along an irrigation canal operated by the Arvin-Edison Water Storage District near Bakersfield, California.

FERC staff preliminarily found that the project would not change the canal’s primary agricultural water-delivery purpose and meets the qualifying conduit hydropower criteria. That preliminary finding means the project would not require a licence or exemption from licensing. Comments and intervention motions are due by 16 November 2026.

## Data

### FERC schedule for Zushi’s conduit hydro project

Application and comment milestones stated by FERC in docket CD27-2-000.

Methodology: Filing dates and the comment deadline are transcribed from FERC’s notice.

| date | label | description | status |
|---|---|---|---|
| 2026-10-01 | Application filed | Zushi Renewables filed for its conduit hydrokinetic project. | occurred |
| 2026-11-16 | Comments and intervention deadline | Comments and intervention motions in docket CD27-2-000 are due by 5 p.m. Eastern Time. | scheduled |

Sources: <https://www.federalregister.gov/documents/2026/10/20/2026-21437/zushi-renewables-llc-notice-of-preliminary-determination-of-a-qualifying-conduit-hydropower-facility> · Download data: [JSON](https://newsverum.com/api/v1/articles/zushi-renewables-arvin-edison-canal-hydro-ferc-2026/data/regulatory-milestones?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/zushi-renewables-arvin-edison-canal-hydro-ferc-2026/data/regulatory-milestones?lang=en&format=csv)

## Sources

- [Federal Energy Regulatory Commission](<https://www.federalregister.gov/documents/2026/10/20/2026-21437/zushi-renewables-llc-notice-of-preliminary-determination-of-a-qualifying-conduit-hydropower-facility>) (Source checked: 2026-10-21; Published: 2026-10-20)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
