# U.S. Energy Department backs proposal for large PJM power users to pay new capacity costs

> The department backed FERC guidance for PJM that would assign new generation and infrastructure costs to large loads.

- Canonical URL: https://newsverum.com/en/news/us-doe-pjm-large-loads-pay-grid-costs-october-2026
- Publisher: Newsverum
- Section: Energy
- Country: United States
- Published: 2026-10-11T15:19:59+00:00
- Updated: 2026-10-11T15:19:59+00:00
- Event / data period: 2026-10-09
- Other editions: [Türkçe](https://newsverum.com/tr/news/us-doe-pjm-large-loads-pay-grid-costs-october-2026.md), [العربية](https://newsverum.com/ar/news/us-doe-pjm-large-loads-pay-grid-costs-october-2026.md), [Français](https://newsverum.com/fr/news/us-doe-pjm-large-loads-pay-grid-costs-october-2026.md), [Español](https://newsverum.com/es/news/us-doe-pjm-large-loads-pay-grid-costs-october-2026.md), [Deutsch](https://newsverum.com/de/news/us-doe-pjm-large-loads-pay-grid-costs-october-2026.md), [Português](https://newsverum.com/pt/news/us-doe-pjm-large-loads-pay-grid-costs-october-2026.md)

The U.S. Department of Energy said on October 9 that it supported Federal Energy Regulatory Commission guidance for PJM’s proposed Reliability Backstop Procurement. DOE said it had filed a notice of intervention and a statement of position with FERC.

The proposal would require new, large electricity users to cover the generation and grid infrastructure needed to serve them. DOE said the approach aims to prevent existing households and businesses from subsidizing those loads and to improve demand transparency; FERC’s guidance is not itself a final tariff rule.

## Data

### Source data

Methodology: Values retain the period and scope stated by the source; no additional conversion or estimate is introduced.

| date | label | description | status |
|---|---|---|---|
| 2026-10-09 | U.S. Energy Department backs proposal for large PJM power users to pay new capacity costs | The company or agency announced the event in its release; this record does not treat a proposal or demonstration as an operating result. | occurred |

Sources: <https://www.energy.gov/articles/energy-department-supports-fercs-call-pjm-protect-ratepayers-and-build-more-reliable-power> · Download data: [JSON](https://newsverum.com/api/v1/articles/us-doe-pjm-large-loads-pay-grid-costs-october-2026/data/source-reported-data?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/us-doe-pjm-large-loads-pay-grid-costs-october-2026/data/source-reported-data?lang=en&format=csv)

## Sources

- [U.S. Department of Energy](<https://www.energy.gov/articles/energy-department-supports-fercs-call-pjm-protect-ratepayers-and-build-more-reliable-power>) (Source checked: 2026-10-11; Published: 2026-10-09)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
