# Spain authorizes Tesouro Storage battery hybrid project in As Pontes de García Rodríguez, A Coruña

> The Official Gazette published on 2026-10-19 an administrative prior and construction authorization for the Tesouro Storage battery storage module in As Pontes de García Rodríguez, A Coruña. Its installed power is 17.5 MW, and it is to be hybridized with an existing wind facility.

- Canonical URL: https://newsverum.com/en/news/tesouro-storage-battery-wind-hybrid-authorization-2026
- Publisher: Newsverum
- Section: Energy
- Country: Spain
- Published: 2026-10-20T23:01:23+00:00
- Updated: 2026-10-20T23:01:23+00:00
- Event / data period: 2026-10-19
- Other editions: [Türkçe](https://newsverum.com/tr/news/tesouro-storage-battery-wind-hybrid-authorization-2026.md), [العربية](https://newsverum.com/ar/news/tesouro-storage-battery-wind-hybrid-authorization-2026.md), [Français](https://newsverum.com/fr/news/tesouro-storage-battery-wind-hybrid-authorization-2026.md), [Español](https://newsverum.com/es/news/tesouro-storage-battery-wind-hybrid-authorization-2026.md), [Deutsch](https://newsverum.com/de/news/tesouro-storage-battery-wind-hybrid-authorization-2026.md), [Português](https://newsverum.com/pt/news/tesouro-storage-battery-wind-hybrid-authorization-2026.md)

The decision authorizes construction of the specified battery module and connection works. It does not establish that construction is complete or that the facility is operating. The existing wind plant is listed at 50.4 MW.

The decision authorizes the specified battery module and connection infrastructure; it does not mean construction is complete or the site is operating.

## Data

### Project power in the BOE decision

Installed power of the authorized or assessed project components.

Methodology: MW values are installed power stated in the decision. MW is power, not battery energy capacity in MWh.

| Indicator | Value |
|---|---|
| Installed power | 17.5 |
| Existing generating plant power | 50.4 |

Sources: <https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21769> · Download data: [JSON](https://newsverum.com/api/v1/articles/tesouro-storage-battery-wind-hybrid-authorization-2026/data/project-capacity?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/tesouro-storage-battery-wind-hybrid-authorization-2026/data/project-capacity?lang=en&format=csv)

## Sources

- [Boletín Oficial del Estado (BOE)](<https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21769>) (Source checked: 2026-10-21; Published: 2026-10-19)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
