# Taiwan completes NT$2.354bn Laonong River water project

> The Ministry of Economic Affairs says the completed subsurface-flow scheme adds a designed 100,000 tonnes a day of water extraction and strengthens supply flexibility in the south.

- Canonical URL: https://newsverum.com/en/news/taiwan-laonong-river-subsurface-water-project-completed-2026
- Publisher: Newsverum
- Section: Infrastructure
- Country: Taiwan
- Published: 2026-10-18T21:48:10+00:00
- Updated: 2026-10-18T21:48:10+00:00
- Event / data period: 2026-10-17
- Other editions: [Türkçe](https://newsverum.com/tr/news/taiwan-laonong-river-subsurface-water-project-completed-2026.md), [العربية](https://newsverum.com/ar/news/taiwan-laonong-river-subsurface-water-project-completed-2026.md), [Français](https://newsverum.com/fr/news/taiwan-laonong-river-subsurface-water-project-completed-2026.md), [Español](https://newsverum.com/es/news/taiwan-laonong-river-subsurface-water-project-completed-2026.md), [Deutsch](https://newsverum.com/de/news/taiwan-laonong-river-subsurface-water-project-completed-2026.md), [Português](https://newsverum.com/pt/news/taiwan-laonong-river-subsurface-water-project-completed-2026.md)

Taiwan’s Water Resources Agency said the Laonong River (Liling) subsurface-flow project held its completion ceremony on October 17. The project cost NT$2.354 billion and includes intake facilities designed for 100,000 tonnes a day, as well as a water-pipe bridge about 945 metres long.

The agency said the new source will contribute to stable supplies in southern Taiwan. It reported that the Gaoping River system’s subsurface-water capacity is projected to reach 900,000 tonnes a day in 2026, 550,000 tonnes above the 2017 level; these are system-wide figures, not the output of this project alone.

## Data

### Laonong River water project

Official project figures reported by Taiwan’s Water Resources Agency on completion.

Methodology: Values are transcribed from the release; capacity is designed intake, while river-system supply projections described in the article are excluded from these project data.

| Project cost | Designed intake capacity | Water-pipe bridge length |
|---|---|---|
| 2.354 | 100000 | 945 |

Sources: <https://www.moea.gov.tw/mns/Populace/news/News.aspx?kind=1&menu_id=40&news_id=124285> · Download data: [JSON](https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026/data/taiwan-laonong-river-subsurface-water-project-completed?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/taiwan-laonong-river-subsurface-water-project-completed-2026/data/taiwan-laonong-river-subsurface-water-project-completed?lang=en&format=csv)

## Sources

- [Taiwan Ministry of Economic Affairs, Water Resources Agency](<https://www.moea.gov.tw/mns/Populace/news/News.aspx?kind=1&menu_id=40&news_id=124285>) (Source checked: 2026-10-19; Published: 2026-10-17)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
