# Syria opens Arab Gas Pipeline link and training center

> Homs section connects 186 kilometres to the existing network.

- Canonical URL: https://newsverum.com/en/news/syria-opens-arab-gas-pipeline-link-and-training-center-2026
- Publisher: Newsverum
- Section: Energy
- Published: 2026-10-02T21:09:51+03:00
- Updated: 2026-10-07T00:57:07+03:00
- Event / data period: 2026-09-30
- Other editions: [Türkçe](https://newsverum.com/tr/news/syria-opens-arab-gas-pipeline-link-and-training-center-2026.md), [العربية](https://newsverum.com/ar/news/syria-opens-arab-gas-pipeline-link-and-training-center-2026.md), [Français](https://newsverum.com/fr/news/syria-opens-arab-gas-pipeline-link-and-training-center-2026.md), [Español](https://newsverum.com/es/news/syria-opens-arab-gas-pipeline-link-and-training-center-2026.md), [Deutsch](https://newsverum.com/de/news/syria-opens-arab-gas-pipeline-link-and-training-center-2026.md), [Português](https://newsverum.com/pt/news/syria-opens-arab-gas-pipeline-link-and-training-center-2026.md)

SANA reported the opening of a new Arab Gas Pipeline phase in Homs by Syrian Petroleum Company. The company said 186 kilometres were connected to roughly 380 kilometres of existing lines.

Reported transmission capacity reaches 11 million cubic metres daily. The rehabilitated Furqlus training center also reopened. Capacity is not a measurement of actual daily gas flows.

## Sources

- [SANA](<https://sana.sy/en/syria/2346979/>) (Source checked: 2026-10-02; Published: 2026-09-30)

## Correction history

- 2026-10-07T00:57:07+03:00: German and Portuguese editions and translations of the data and correction explanations have been added to this article.

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
