# Standard Uranium completes 6,734-metre summer program at Davidson River

> The Saskatchewan campaign drilled 12 holes and found several intervals of anomalous radioactivity; uranium assays remain pending.

- Canonical URL: https://newsverum.com/en/news/standard-uranium-completes-davidson-river-summer-drilling-2026
- Publisher: Newsverum
- Section: Energy
- Country: Canada
- Published: 2026-10-07T12:59:36+00:00
- Updated: 2026-10-07T12:59:36+00:00
- Event / data period: 2026-10-01
- Other editions: [Türkçe](https://newsverum.com/tr/news/standard-uranium-completes-davidson-river-summer-drilling-2026.md), [العربية](https://newsverum.com/ar/news/standard-uranium-completes-davidson-river-summer-drilling-2026.md), [Français](https://newsverum.com/fr/news/standard-uranium-completes-davidson-river-summer-drilling-2026.md), [Español](https://newsverum.com/es/news/standard-uranium-completes-davidson-river-summer-drilling-2026.md), [Deutsch](https://newsverum.com/de/news/standard-uranium-completes-davidson-river-summer-drilling-2026.md), [Português](https://newsverum.com/pt/news/standard-uranium-completes-davidson-river-summer-drilling-2026.md)

Standard Uranium said on October 1 it had completed its 2026 summer drill campaign at the Davidson River project in Saskatchewan. The program drilled 6,734 metres across 12 holes along the Warrior, Bronco and Thunderbird structural corridors, and the company reported anomalous radioactivity in three holes.

The release describes 5.0 metres of composite intervals above 300 counts per second and notes that whole-rock geochemical and uranium assays were still pending. The company said the intervals are downhole lengths and true thicknesses cannot yet be determined. Radioactivity readings are preliminary exploration indicators, not confirmed uranium grades.

## Data

### Davidson River summer drilling

Program totals and preliminary radioactivity results from the 2026 summer drill campaign in Saskatchewan.

Methodology: Company-reported completed drilling totals. Assays remained pending at release; drill lengths are downhole and true thickness is undetermined.

| label | value | unit | period | basis |
|---|---|---|---|---|
| Total summer drilling | 6734 | metres | 2026-10-01 | observed |
| Completed drill holes | 12 | drills | 2026-10-01 | observed |
| Combined downhole intervals above the anomalous threshold | 5 | metres | 2026-10-01 | observed |

Sources: <https://www.standarduranium.ca/news-releases/standard-uranium-intersects-significant-structure-alteration-and-anomalous-radioactivity-in-multiple-drill-holes-at-the-davidson-river-project-concludes-summer-drill-program> · Download data: [JSON](https://newsverum.com/api/v1/articles/standard-uranium-completes-davidson-river-summer-drilling-2026/data/standard-uranium-davidson-river-summer-drilling?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/standard-uranium-completes-davidson-river-summer-drilling-2026/data/standard-uranium-davidson-river-summer-drilling?lang=en&format=csv)

## Sources

- [Standard Uranium](<https://www.standarduranium.ca/news-releases/standard-uranium-intersects-significant-structure-alteration-and-anomalous-radioactivity-in-multiple-drill-holes-at-the-davidson-river-project-concludes-summer-drill-program>) (Source checked: 2026-10-07; Published: 2026-10-01)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
