# Spain publishes acceptance of Enel’s withdrawal from El Clavel solar application

> Spain published a decision accepting Enel Green Power España’s withdrawal of its preliminary administrative-authorisation application for the proposed El Clavel photovoltaic plant. The decision was signed on 20 May and appeared in the Official State Gazette on 31 October, closing file SGIISE/PFot-933.

- Canonical URL: https://newsverum.com/en/news/spain-enel-el-clavel-110-741-mw-permit-withdrawal-2026
- Publisher: Newsverum
- Section: Energy
- Country: Spain
- Published: 2026-10-31T07:58:22+00:00
- Updated: 2026-10-31T07:58:22+00:00
- Event / data period: 2026-05-20
- Other editions: [Türkçe](https://newsverum.com/tr/news/spain-enel-el-clavel-110-741-mw-permit-withdrawal-2026.md), [العربية](https://newsverum.com/ar/news/spain-enel-el-clavel-110-741-mw-permit-withdrawal-2026.md), [Français](https://newsverum.com/fr/news/spain-enel-el-clavel-110-741-mw-permit-withdrawal-2026.md), [Español](https://newsverum.com/es/news/spain-enel-el-clavel-110-741-mw-permit-withdrawal-2026.md), [Deutsch](https://newsverum.com/de/news/spain-enel-el-clavel-110-741-mw-permit-withdrawal-2026.md), [Português](https://newsverum.com/pt/news/spain-enel-el-clavel-110-741-mw-permit-withdrawal-2026.md)

The application covered 110.741 MW of installed capacity and associated power-export infrastructure in Montealegre del Castillo, Almansa and Bonete, in Albacete province. The decision records an unfavourable environmental-impact finding concerning steppe birds and their habitat, as well as the expiry of grid-access and connection permits.

Enel requested withdrawal on 8 April after the adverse environmental assessment prevented approval of the application. The published measure accepts that request and archives the administrative case. It concerns a proposed development’s permit process, rather than the shutdown of an operating power station or a newly awarded construction contract.

## Data

### Source publication

Publication of the official announcement on 31 October 2026.

Methodology: The date records publication of the cited primary source. Statistical reference periods and announced future actions are identified in the article.

| date | label | description | status |
|---|---|---|---|
| 2026-10-31 | Spain publishes acceptance of Enel’s withdrawal from El Clavel solar application | Spain published a decision accepting Enel Green Power España’s withdrawal of its preliminary administrative-authorisation application for the proposed El Clavel photovoltaic plant. The decision was signed on 20 May and appeared in the Official State Gazette on 31 October, closing file SGIISE/PFot-933. | occurred |

Sources: <https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-22876> · Download data: [JSON](https://newsverum.com/api/v1/articles/spain-enel-el-clavel-110-741-mw-permit-withdrawal-2026/data/source-announcement?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/spain-enel-el-clavel-110-741-mw-permit-withdrawal-2026/data/source-announcement?lang=en&format=csv)

## Sources

- [Agencia Estatal Boletín Oficial del Estado (BOE)](<https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-22876>) (Source checked: 2026-10-31; Published: 2026-10-31)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
