# SLB awarded Oman’s Bisat-B facility expansion

> Planned gross fluids handling capacity is 548,000 barrels per day.

- Canonical URL: https://newsverum.com/en/news/slb-awarded-omans-bisat-b-facility-expansion
- Publisher: Newsverum
- Section: Energy
- Published: 2026-10-02T16:15:39+03:00
- Updated: 2026-10-12T06:26:46+03:00
- Event / data period: 2026-09-23
- Other editions: [Türkçe](https://newsverum.com/tr/news/slb-awarded-omans-bisat-b-facility-expansion.md), [العربية](https://newsverum.com/ar/news/slb-awarded-omans-bisat-b-facility-expansion.md), [Français](https://newsverum.com/fr/news/slb-awarded-omans-bisat-b-facility-expansion.md), [Español](https://newsverum.com/es/news/slb-awarded-omans-bisat-b-facility-expansion.md), [Deutsch](https://newsverum.com/de/news/slb-awarded-omans-bisat-b-facility-expansion.md), [Português](https://newsverum.com/pt/news/slb-awarded-omans-bisat-b-facility-expansion.md)

SLB announced on September 23 that OQ Exploration & Production awarded the Bisat-B expansion in Oman. The scope covers design, engineering, procurement, construction and commissioning.

Planned gross fluids handling capacity is 548,000 barrels per day, rather than an oil production figure. SLB expects completion in 19 months. The contract also includes four years of operations and maintenance.

## Sources

- [SLB](<https://www.slb.com/newsroom/press-release/2026/pr-2026-0923-slb-oqep-oman>) (Source checked: 2026-10-02)

## Correction history

- 2026-10-06T21:57:45+03:00: The missing language translations for this article have been added.
- 2026-10-07T00:53:24+03:00: German and Portuguese editions and translations of the data and correction explanations have been added to this article.
- 2026-10-12T06:26:46+03:00: Translations of the earlier correction note were corrected; the original note and its date were preserved.

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
