# Selkirk Copper reports 44.7 metres grading 2.12% copper at Minto North

> Hole 26SCM237 from July drilling also returned gold and silver; reported lengths are downhole intervals.

- Canonical URL: https://newsverum.com/en/news/selkirk-minto-north-drill-results-october-2026
- Publisher: Newsverum
- Section: Economy
- Country: Canada
- Published: 2026-10-15T16:53:09+00:00
- Updated: 2026-10-15T16:53:09+00:00
- Event / data period: 2026-10-15
- Other editions: [Türkçe](https://newsverum.com/tr/news/selkirk-minto-north-drill-results-october-2026.md), [العربية](https://newsverum.com/ar/news/selkirk-minto-north-drill-results-october-2026.md), [Français](https://newsverum.com/fr/news/selkirk-minto-north-drill-results-october-2026.md), [Español](https://newsverum.com/es/news/selkirk-minto-north-drill-results-october-2026.md), [Deutsch](https://newsverum.com/de/news/selkirk-minto-north-drill-results-october-2026.md), [Português](https://newsverum.com/pt/news/selkirk-minto-north-drill-results-october-2026.md)

Selkirk Copper released new results from holes drilled in July 2026 during Phase 2 at its Minto copper-gold-silver project. At Minto North, the company reported 44.7 metres grading 2.12% copper, 1.16 grams per tonne gold and 10.7 grams per tonne silver in hole 26SCM237; the interval is a downhole length.

The release also lists internal intervals of 11.1 and 9.2 metres in that hole, along with results from other areas. Selkirk said that by October 14, Phase 2 had completed 54,711 metres in 223 holes. The company estimated true widths at about 80–90% of core lengths; drill intercepts alone do not establish a resource increase or economic extractability.

## Data

### 26SCM237: 44.7 m downhole interval grading 2.12% Cu, 1.16 g/t Au and 10.7 g/t Ag.

This record summarizes the primary announcement; it is not independent verification.

Methodology: Summary of the event reported in the primary announcement; source-provided measures and qualifications are retained.

| date | label | description | status |
|---|---|---|---|
| 2026-10-15 | 26SCM237: 44.7 m downhole interval grading 2.12% Cu, 1.16 g/t Au and 10.7 g/t Ag. | Hole 26SCM237 from July drilling also returned gold and silver; reported lengths are downhole intervals. | occurred |

Sources: <https://www.newsfilecorp.com/release/319123> · Download data: [JSON](https://newsverum.com/api/v1/articles/selkirk-minto-north-drill-results-october-2026/data/reported-announcement?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/selkirk-minto-north-drill-results-october-2026/data/reported-announcement?lang=en&format=csv)

### Minto North hole 26SCM237 intercept

Company-reported downhole interval and metal values for a hole drilled in July 2026.

Methodology: These are company-reported downhole length and grades, not true widths. The company estimated true width at approximately 80–90% of core length. No metal equivalent is calculated here.

| Drill hole | Downhole interval (m) | Copper grade (%) | Gold grade (g/t) | Silver grade (g/t) |
|---|---|---|---|---|
| 26SCM237 | 44.7 | 2.12 | 1.16 | 10.7 |

Sources: <https://www.newsfilecorp.com/release/319123> · Download data: [JSON](https://newsverum.com/api/v1/articles/selkirk-minto-north-drill-results-october-2026/data/minto-north-hole-26scm237?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/selkirk-minto-north-drill-results-october-2026/data/minto-north-hole-26scm237?lang=en&format=csv)

## Sources

- [Selkirk Copper Mines Inc. (company announcement)](<https://www.newsfilecorp.com/release/319123>) (Source checked: 2026-10-15; Published: 2026-10-15)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
