# San Serván battery hybrid proposal enters 15-business-day public review

> Spain’s government delegation in Extremadura opened public review of an application for a battery system to hybridize the existing 43.2 MW FV San Serván 2020 solar plant in Mérida. The notice appeared in the BOE on 20 October.

- Canonical URL: https://newsverum.com/en/news/san-servan-hybrid-battery-storage-public-review
- Publisher: Newsverum
- Section: Energy
- Country: Spain
- Published: 2026-10-20T23:01:23+00:00
- Updated: 2026-10-20T23:01:23+00:00
- Event / data period: 2026-10-20
- Other editions: [Türkçe](https://newsverum.com/tr/news/san-servan-hybrid-battery-storage-public-review.md), [العربية](https://newsverum.com/ar/news/san-servan-hybrid-battery-storage-public-review.md), [Français](https://newsverum.com/fr/news/san-servan-hybrid-battery-storage-public-review.md), [Español](https://newsverum.com/es/news/san-servan-hybrid-battery-storage-public-review.md), [Deutsch](https://newsverum.com/de/news/san-servan-hybrid-battery-storage-public-review.md), [Português](https://newsverum.com/pt/news/san-servan-hybrid-battery-storage-public-review.md)

The application describes a 40 MW nominal system with 160 MWh of storage capacity and a project budget of €17,417,050. Interested parties may submit comments within 15 business days.

This is a public review of applications for prior and construction authorization; it does not mean approval has been granted or the facility built.

## Data

### Source and measure

Project information stated in the official source.

Methodology: The source gives a 15-business-day period; no closing date has been calculated.

| Indicator | Days |
|---|---|
| Application review period: 15 business days | 15 |

Sources: <https://www.boe.es/diario_boe/txt.php?id=BOE-B-2026-34144> · Download data: [JSON](https://newsverum.com/api/v1/articles/san-servan-hybrid-battery-storage-public-review/data/release-statistic?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/san-servan-hybrid-battery-storage-public-review/data/release-statistic?lang=en&format=csv)

### Installed capacity stated in application

Power figures for the existing plant and proposed battery module.

Methodology: Figures transcribed from the application; they do not indicate approval or commissioning.

| Measure | Days |
|---|---|
| Existing solar plant power | 43.2 |
| Proposed battery system power | 40 |

Sources: <https://www.boe.es/diario_boe/txt.php?id=BOE-B-2026-34144> · Download data: [JSON](https://newsverum.com/api/v1/articles/san-servan-hybrid-battery-storage-public-review/data/storage-power?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/san-servan-hybrid-battery-storage-public-review/data/storage-power?lang=en&format=csv)

## Sources

- [Boletín Oficial del Estado (BOE)](<https://www.boe.es/diario_boe/txt.php?id=BOE-B-2026-34144>) (Source checked: 2026-10-21; Published: 2026-10-20)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
