# Saipem 7000 completes Bouri gas-module lift in Libya

> Site integration follows within the existing EPCI project.

- Canonical URL: https://newsverum.com/en/news/saipem-7000-completes-bouri-gas-module-lift-in-libya
- Publisher: Newsverum
- Section: Energy
- Published: 2026-10-02T21:09:51+03:00
- Updated: 2026-10-07T00:49:04+03:00
- Event / data period: 2026-06-03
- Other editions: [Türkçe](https://newsverum.com/tr/news/saipem-7000-completes-bouri-gas-module-lift-in-libya.md), [العربية](https://newsverum.com/ar/news/saipem-7000-completes-bouri-gas-module-lift-in-libya.md), [Français](https://newsverum.com/fr/news/saipem-7000-completes-bouri-gas-module-lift-in-libya.md), [Español](https://newsverum.com/es/news/saipem-7000-completes-bouri-gas-module-lift-in-libya.md), [Deutsch](https://newsverum.com/de/news/saipem-7000-completes-bouri-gas-module-lift-in-libya.md), [Português](https://newsverum.com/pt/news/saipem-7000-completes-bouri-gas-module-lift-in-libya.md)

Saipem said on June 3 that it lifted the Bouri gas-recovery module onto an existing offshore platform. The Rosetti Marino-built module weighs more than 5,200 tonnes.

The milestone does not establish gas production start-up. Post-lift review needs separate acceptance records for hook-up, safety systems and commissioning. Placing heavy equipment and verifying operational performance are different delivery steps.

## Sources

- [Saipem](<https://www.saipem.com/en/media/news/Saipem-7000-successfully-completes-the-lifting-of-the-gas-treatment-module-for-the-Bouri-project-in-Libya>) (Source checked: 2026-10-02; Published: 2026-06-03)

## Correction history

- 2026-10-06T21:57:22+03:00: The missing language translations for this article have been added.
- 2026-10-07T00:49:04+03:00: German and Portuguese editions and translations of the data and correction explanations have been added to this article.

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
