# RTE and farm groups sign support framework for new power lines

> The framework provides annual support for 80 years, calculated per equivalent pylon for new 400 kV and 225 kV lines.

- Canonical URL: https://newsverum.com/en/news/rte-france-farm-compensation-framework-transmission-lines-2026
- Publisher: Newsverum
- Section: Energy
- Country: France
- Published: 2026-10-15T20:19:53+00:00
- Updated: 2026-10-15T20:19:53+00:00
- Event / data period: 2026-10-12
- Other editions: [Türkçe](https://newsverum.com/tr/news/rte-france-farm-compensation-framework-transmission-lines-2026.md), [العربية](https://newsverum.com/ar/news/rte-france-farm-compensation-framework-transmission-lines-2026.md), [Français](https://newsverum.com/fr/news/rte-france-farm-compensation-framework-transmission-lines-2026.md), [Español](https://newsverum.com/es/news/rte-france-farm-compensation-framework-transmission-lines-2026.md), [Deutsch](https://newsverum.com/de/news/rte-france-farm-compensation-framework-transmission-lines-2026.md), [Português](https://newsverum.com/pt/news/rte-france-farm-compensation-framework-transmission-lines-2026.md)

France’s transmission operator RTE, Chambres d’agriculture France and the FNSEA signed a national support framework on 12 October for farms affected by new high-voltage lines. It covers overhead-line projects at 400 kV and 225 kV.

RTE said project-support plans will provide €1,000 a year per equivalent pylon for new 400 kV lines and €375 for 225 kV lines. Payments are scheduled for 80 years from the line’s commissioning. These are framework rates, not the total amount any one farm will receive.

## Data

### Event in the official release

Summary of the energy-sector development reported by the source.

Methodology: This is a descriptive record of the event reported by the source; it does not claim independent measurement or additional realized outcomes.

| date | label | description | status |
|---|---|---|---|
| 2026-10-12 | RTE and farm groups sign support framework for new power lines | The framework provides annual support for 80 years, calculated per equivalent pylon for new 400 kV and 225 kV lines. | occurred |

Sources: <https://www.rte-france.com/actualites/2026-10-12-accord-national-faveur-exploitants-agricoles> · Download data: [JSON](https://newsverum.com/api/v1/articles/rte-france-farm-compensation-framework-transmission-lines-2026/data/source-reported-energy-event?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/rte-france-farm-compensation-framework-transmission-lines-2026/data/source-reported-energy-event?lang=en&format=csv)

### Annual framework support rates

Euros per equivalent pylon per year for new lines; not a farm total.

Methodology: This is a descriptive record of the event reported by the source; it does not claim independent measurement or additional realized outcomes.

| Line voltage | Annual support per equivalent pylon |
|---|---|
| 400 kV | 1000 |
| 225 kV | 375 |

Sources: <https://www.rte-france.com/actualites/2026-10-12-accord-national-faveur-exploitants-agricoles> · Download data: [JSON](https://newsverum.com/api/v1/articles/rte-france-farm-compensation-framework-transmission-lines-2026/data/annual-support-rates?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/rte-france-farm-compensation-framework-transmission-lines-2026/data/annual-support-rates?lang=en&format=csv)

## Sources

- [Réseau de Transport d’Électricité (RTE)](<https://www.rte-france.com/actualites/2026-10-12-accord-national-faveur-exploitants-agricoles>) (Source checked: 2026-10-15; Published: 2026-10-12)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
