# Trident OGX sets out MKB field production targets

> Trident OGX’s chief executive described five production lines at the Mengo-Kundji-Bindi field in the Republic of Congo and outlined company output targets.

- Canonical URL: https://newsverum.com/en/news/republic-of-congo-trident-mkb-production-plans-2026
- Publisher: Newsverum
- Section: Energy
- Country: Congo - Brazzaville
- Published: 2026-10-10T17:23:44+00:00
- Updated: 2026-10-10T17:23:44+00:00
- Event / data period: 2026-10-07
- Other editions: [Türkçe](https://newsverum.com/tr/news/republic-of-congo-trident-mkb-production-plans-2026.md), [العربية](https://newsverum.com/ar/news/republic-of-congo-trident-mkb-production-plans-2026.md), [Français](https://newsverum.com/fr/news/republic-of-congo-trident-mkb-production-plans-2026.md), [Español](https://newsverum.com/es/news/republic-of-congo-trident-mkb-production-plans-2026.md), [Deutsch](https://newsverum.com/de/news/republic-of-congo-trident-mkb-production-plans-2026.md), [Português](https://newsverum.com/pt/news/republic-of-congo-trident-mkb-production-plans-2026.md)

Trident OGX chief executive Lucien Ebata told a hydrocarbons-sector meeting in Brazzaville that the company had installed new equipment at the Mengo-Kundji-Bindi (MKB) field, with five production lines intended to enable output of about 2,500 barrels a day. This is a company statement reported by ACI, not an independently verified production measurement.

Ebata said the company aims to reach 10,000 barrels a day by the end of 2026 and, from 2027, to develop the Mengo and Kundji fields with an ambition of 45,000 to 50,000 barrels a day. These are company targets; the report did not say those output levels had been achieved.

## Data

### MKB field production targets

Current work and future output goals described by a Trident OGX executive in October 2026.

Methodology: Reported goals and field details are taken from ACI's meeting report. Output targets are forward-looking company statements, not reported production results.

| date | label | description | status |
|---|---|---|---|
| 2026-10-07 | MKB field production targets | Trident OGX said five production lines were intended to enable about 2,500 barrels per day, with a 10,000-barrel-per-day target by end-2026 and a 45,000–50,000-barrel-per-day ambition from Mengo-Kundji development starting in 2027. | occurred |

Sources: <https://www.aci.cg/congo-hydrocarbures-les-experts-petroliers-planchent-sur-la-fixation-des-prix-fiscaux-des-bruts-au-3e-trimestre-2026/> · Download data: [JSON](https://newsverum.com/api/v1/articles/republic-of-congo-trident-mkb-production-plans-2026/data/trident-mkb-production-announcement?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/republic-of-congo-trident-mkb-production-plans-2026/data/trident-mkb-production-announcement?lang=en&format=csv)

## Sources

- [Agence Congolaise d’Information](<https://www.aci.cg/congo-hydrocarbures-les-experts-petroliers-planchent-sur-la-fixation-des-prix-fiscaux-des-bruts-au-3e-trimestre-2026/>) (Source checked: 2026-10-10; Published: 2026-10-08)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
