# PowerBank wins stormwater grant for planned New York solar project

> The grant reimburses up to $952,583 in eligible costs; a potential $8 million federal tax credit remains an estimate subject to eligibility.

- Canonical URL: https://newsverum.com/en/news/powerbank-corp-canada-awarded-952583-stormwater-grant-resumes-6-9mw-ny-solar-2026
- Publisher: Newsverum
- Section: Energy
- Country: Canada
- Published: 2026-11-24T14:46:32+00:00
- Updated: 2026-11-25T18:24:11+03:00
- Event / data period: 2026-11-24
- Other editions: [Türkçe](https://newsverum.com/tr/news/powerbank-corp-canada-awarded-952583-stormwater-grant-resumes-6-9mw-ny-solar-2026.md), [العربية](https://newsverum.com/ar/news/powerbank-corp-canada-awarded-952583-stormwater-grant-resumes-6-9mw-ny-solar-2026.md), [Français](https://newsverum.com/fr/news/powerbank-corp-canada-awarded-952583-stormwater-grant-resumes-6-9mw-ny-solar-2026.md), [Español](https://newsverum.com/es/news/powerbank-corp-canada-awarded-952583-stormwater-grant-resumes-6-9mw-ny-solar-2026.md), [Deutsch](https://newsverum.com/de/news/powerbank-corp-canada-awarded-952583-stormwater-grant-resumes-6-9mw-ny-solar-2026.md), [Português](https://newsverum.com/pt/news/powerbank-corp-canada-awarded-952583-stormwater-grant-resumes-6-9mw-ny-solar-2026.md)

PowerBank said on 24 November 2026 that its planned 6.9 MW Highway 28 community solar project in New York had been awarded a stormwater grant of up to $952,583 by the Catskill Watershed Corporation. The grant offsets eligible costs of the project’s stormwater plan.

The company reported $893,445 in previously approved New York State Energy Research and Development Authority incentives. It expects to qualify for about $1.52 million more under a separate state program and estimates a potential federal investment tax credit of about $8 million, subject to federal requirements. The grant ceiling is not the amount already reimbursed, and the tax credit is not confirmed.

PowerBank said site preparation and limited stormwater work had resumed under existing approvals. Full construction still requires project financing and remaining permits. The company estimates development and construction value at approximately $17 million.

## Data

### PowerBank Highway 28 Solar Project Metrics

Planned New York project terms, approved incentive and conditional estimates; grant ceiling is not cash received.

Methodology: PowerBank’s 24 November disclosure; project location is New York. Estimates and planned capacity are not realized outcomes.

| label | value | unit | period | basis | value_qualifier |
|---|---|---|---|---|---|
| Planned project capacity | 6.9 | MW | 2026-11-24 | target |  |
| Approximate Project Value | 17.0 | million USD | 2026-11-24 | estimate | approximate |
| Grant ceiling for eligible costs, not reimbursement received | 952583.0 | USD | 2026-11-24 | observed | upper-bound |
| Approved NYSERDA Incentives | 893445.0 | USD | 2026-11-24 | observed |  |
| Estimated Federal ITC | 8.0 | million USD | 2026-11-24 | estimate | approximate |

Sources: <https://www.sec.gov/Archives/edgar/data/2011053/000149315226053920/ex99-1.htm> · Download data: [JSON](https://newsverum.com/api/v1/articles/powerbank-corp-canada-awarded-952583-stormwater-grant-resumes-6-9mw-ny-solar-2026/data/powerbank-corp-canada-awarde-metrics?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/powerbank-corp-canada-awarded-952583-stormwater-grant-resumes-6-9mw-ny-solar-2026/data/powerbank-corp-canada-awarde-metrics?lang=en&format=csv)

## Sources

- [PowerBank Corporation (SEC Form 6-K)](<https://www.sec.gov/Archives/edgar/data/2011053/000149315226053920/ex99-1.htm>) (Source checked: 2026-11-24; Published: 2026-11-24)

## Correction history

- 2026-11-25T18:24:11+03:00: The New York project was incorrectly coded as Canadian; its planned 6.9 MW was typed as a count, and estimates and the grant ceiling were presented as observed amounts. These fields now show the proper geography, unit and qualifications.

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
