# Osman Gazi platform’s Black Sea production timetable outlined

> The September statement sets targets for deployment and year-end production preparations.

- Canonical URL: https://newsverum.com/en/news/osman-gazi-platforms-black-sea-production-timetable-outlined
- Publisher: Newsverum
- Section: Energy
- Country: Türkiye
- Published: 2026-10-02T13:01:51+03:00
- Updated: 2026-10-07T00:52:41+03:00
- Event / data period: 2026-09-17
- Other editions: [Türkçe](https://newsverum.com/tr/news/osman-gazi-platforms-black-sea-production-timetable-outlined.md), [العربية](https://newsverum.com/ar/news/osman-gazi-platforms-black-sea-production-timetable-outlined.md), [Français](https://newsverum.com/fr/news/osman-gazi-platforms-black-sea-production-timetable-outlined.md), [Español](https://newsverum.com/es/news/osman-gazi-platforms-black-sea-production-timetable-outlined.md), [Deutsch](https://newsverum.com/de/news/osman-gazi-platforms-black-sea-production-timetable-outlined.md), [Português](https://newsverum.com/pt/news/osman-gazi-platforms-black-sea-production-timetable-outlined.md)

The ministry’s 17 September statement targeted sending the Osman Gazi floating production platform to the Black Sea in late October. First gas flaring under the second phase was planned by year-end.

The platform is expected to add 10 million cubic metres to daily output. This is a capacity target dependent on completed preparations, rather than production already achieved on the announcement date.

## Sources

- [Enerji ve Tabii Kaynaklar Bakanlığı](<https://www.enerji.gov.tr/haber-detay?id=31929>) (Source checked: 2026-10-02)

## Correction history

- 2026-10-06T21:56:52+03:00: The missing language translations for this article have been added.
- 2026-10-07T00:52:41+03:00: German and Portuguese editions and translations of the data and correction explanations have been added to this article.

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
