# ORNL printed composite nuclear formwork wins CAMX award

> Oak Ridge National Laboratory reported on October 14 that its work on 3D-printed composite formwork for nuclear construction won the CAMX Combined Strength award. The lab said reusable forms were designed, printed and delivered in about two weeks, compared with six months for steel forms.

- Canonical URL: https://newsverum.com/en/news/ornl-composite-printed-nuclear-formwork-camx-award-2026
- Publisher: Newsverum
- Section: Energy
- Country: United States
- Published: 2026-10-15T22:33:53+00:00
- Updated: 2026-10-15T22:33:53+00:00
- Source review period: 2026-10-14
- Other editions: [Türkçe](https://newsverum.com/tr/news/ornl-composite-printed-nuclear-formwork-camx-award-2026.md), [العربية](https://newsverum.com/ar/news/ornl-composite-printed-nuclear-formwork-camx-award-2026.md), [Français](https://newsverum.com/fr/news/ornl-composite-printed-nuclear-formwork-camx-award-2026.md), [Español](https://newsverum.com/es/news/ornl-composite-printed-nuclear-formwork-camx-award-2026.md), [Deutsch](https://newsverum.com/de/news/ornl-composite-printed-nuclear-formwork-camx-award-2026.md), [Português](https://newsverum.com/pt/news/ornl-composite-printed-nuclear-formwork-camx-award-2026.md)

*The source does not state the event date; the period shown is the source review period.*

Those figures describe formwork supply times, not the reactor’s total construction schedule. The full-scale demonstration at Kairos Power’s Oak Ridge campus forms part of work connected with the Hermes low-power demonstration reactor under construction. Use of the forms in portions of Hermes is planned.

## Data

### Source announcement

Methodology: The date identifies publication of the source announcement; this is not an independent performance measurement.

| date | label | description | status |
|---|---|---|---|
| 2026-10-14 | ORNL printed composite nuclear formwork wins CAMX award | Oak Ridge National Laboratory reported on October 14 that its work on 3D-printed composite formwork for nuclear construction won the CAMX Combined Strength award. The lab said reusable forms were designed, printed and delivered in about two weeks, compared with six months for steel forms. | occurred |

Sources: <https://www.ornl.gov/news/3d-printed-forms-speed-nuclear-construction-earn-camx-award/> · Download data: [JSON](https://newsverum.com/api/v1/articles/ornl-composite-printed-nuclear-formwork-camx-award-2026/data/source-announcement?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/ornl-composite-printed-nuclear-formwork-camx-award-2026/data/source-announcement?lang=en&format=csv)

## Sources

- [Oak Ridge National Laboratory](<https://www.ornl.gov/news/3d-printed-forms-speed-nuclear-construction-earn-camx-award/>) (Source checked: 2026-10-15; Published: 2026-10-14)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
