# Naturgy receives construction permit for El Almendro hybrid solar module

> The BOE published on 20 October a construction authorization for Naturgy Renovables’ 36 MW solar module at El Almendro, Huelva, to be hybridized with an existing wind farm.

- Canonical URL: https://newsverum.com/en/news/naturgy-el-almendro-hybrid-solar-construction-permit-2026
- Publisher: Newsverum
- Section: Energy
- Country: Spain
- Published: 2026-10-20T23:01:23+00:00
- Updated: 2026-10-20T23:01:23+00:00
- Event / data period: 2026-10-20
- Other editions: [Türkçe](https://newsverum.com/tr/news/naturgy-el-almendro-hybrid-solar-construction-permit-2026.md), [العربية](https://newsverum.com/ar/news/naturgy-el-almendro-hybrid-solar-construction-permit-2026.md), [Français](https://newsverum.com/fr/news/naturgy-el-almendro-hybrid-solar-construction-permit-2026.md), [Español](https://newsverum.com/es/news/naturgy-el-almendro-hybrid-solar-construction-permit-2026.md), [Deutsch](https://newsverum.com/de/news/naturgy-el-almendro-hybrid-solar-construction-permit-2026.md), [Português](https://newsverum.com/pt/news/naturgy-el-almendro-hybrid-solar-construction-permit-2026.md)

The authorization covers construction of the new photovoltaic module and underground 30 kV evacuation lines. It permits installation but does not report that the facility is complete.

The decision lists the existing PE El Almendro wind farm at 43.35 MW and the solar module at 36 MW. These are power ratings, not energy output.

## Data

### Project figure in decision

Project value stated in the official decision.

Methodology: Value transcribed from the source; it must not be read as realized generation or completed construction.

| Indicator | Value |
|---|---|
| Solar module installed power | 36 |

Sources: <https://www.boe.es/diario_boe/txt.php?id=BOE-B-2026-34151> · Download data: [JSON](https://newsverum.com/api/v1/articles/naturgy-el-almendro-hybrid-solar-construction-permit-2026/data/project-data?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/naturgy-el-almendro-hybrid-solar-construction-permit-2026/data/project-data?lang=en&format=csv)

## Sources

- [Boletín Oficial del Estado (BOE)](<https://www.boe.es/diario_boe/txt.php?id=BOE-B-2026-34151>) (Source checked: 2026-10-21; Published: 2026-10-20)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
