# Milan completes restoration of three monuments in Montanelli Gardens

> The city says conservation work is complete on bronze monuments dedicated to Antonio Stoppani, Gaetano Negri and Giuseppe Giacosa.

- Canonical URL: https://newsverum.com/en/news/milan-restores-stoppani-negri-giacosa-monuments-2026
- Publisher: Newsverum
- Section: Culture
- Country: Italy
- Published: 2026-10-11T23:19:29+00:00
- Updated: 2026-10-11T23:19:29+00:00
- Source review period: 2026-10-12
- Other editions: [Türkçe](https://newsverum.com/tr/news/milan-restores-stoppani-negri-giacosa-monuments-2026.md), [العربية](https://newsverum.com/ar/news/milan-restores-stoppani-negri-giacosa-monuments-2026.md), [Français](https://newsverum.com/fr/news/milan-restores-stoppani-negri-giacosa-monuments-2026.md), [Español](https://newsverum.com/es/news/milan-restores-stoppani-negri-giacosa-monuments-2026.md), [Deutsch](https://newsverum.com/de/news/milan-restores-stoppani-negri-giacosa-monuments-2026.md), [Português](https://newsverum.com/pt/news/milan-restores-stoppani-negri-giacosa-monuments-2026.md)

*The source does not state the event date; the period shown is the source review period.*

Milan said on October 11 that conservation work had finished on monuments to Antonio Stoppani, Gaetano Negri and Giuseppe Giacosa in the Indro Montanelli Public Gardens. The city said the work restored the appearance of the bronze and stone structures while protecting their historic integrity and structural stability.

The municipality put the overall investment at about €40,000 and said the work took less than three months. Restorers cleaned the bronze and stone, repaired joints, renewed the gold lettering on inscriptions and applied protective treatments against weather, pollution and possible vandalism. The work was supervised by the Superintendency of Archaeology, Fine Arts and Landscape for the Metropolitan City of Milan.

## Data

### Restoration summary

Investment and duration reported by the City of Milan for the three monuments.

Methodology: The city’s October 11, 2026 release reported an approximate total investment of €40,000 and a duration of less than three months. The table’s three months is the stated upper bound, not the actual duration.

| Approximate total investment | Duration upper bound (actual duration was shorter) |
|---|---|
| 40000 | 3 |

Sources: <https://www.comune.milano.it/w/arredo-urbano.-completato-il-restauro-conservativo-dei-monumenti-a-stoppani-negri-e-giacosa> · Download data: [JSON](https://newsverum.com/api/v1/articles/milan-restores-stoppani-negri-giacosa-monuments-2026/data/restoration-summary?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/milan-restores-stoppani-negri-giacosa-monuments-2026/data/restoration-summary?lang=en&format=csv)

## Sources

- [Comune di Milano](<https://www.comune.milano.it/w/arredo-urbano.-completato-il-restauro-conservativo-dei-monumenti-a-stoppani-negri-e-giacosa>) (Source checked: 2026-10-12; Published: 2026-10-11)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
