# Spain rejected the permit application for Los Campillos

> The decision rejected the permit application for the Los Campillos project, which had a proposed installed power of 33.825 MW. It was published in the BOE on 2026-10-20.

- Canonical URL: https://newsverum.com/en/news/los-campillos-solar-hybrid-permit-denied-2026
- Publisher: Newsverum
- Section: Energy
- Country: Spain
- Published: 2026-10-20T23:01:23+00:00
- Updated: 2026-10-20T23:01:23+00:00
- Event / data period: 2026-10-20
- Other editions: [Türkçe](https://newsverum.com/tr/news/los-campillos-solar-hybrid-permit-denied-2026.md), [العربية](https://newsverum.com/ar/news/los-campillos-solar-hybrid-permit-denied-2026.md), [Français](https://newsverum.com/fr/news/los-campillos-solar-hybrid-permit-denied-2026.md), [Español](https://newsverum.com/es/news/los-campillos-solar-hybrid-permit-denied-2026.md), [Deutsch](https://newsverum.com/de/news/los-campillos-solar-hybrid-permit-denied-2026.md), [Português](https://newsverum.com/pt/news/los-campillos-solar-hybrid-permit-denied-2026.md)

The decision sets out the application history, technical scope and grounds for refusal. The requested permit was denied; the ruling is not approval to build the project.

## Data

### Project power in the BOE decision

Installed power of the authorized or assessed project components.

Methodology: MW value is transcribed from the BOE decision heading; it is not realized generation.

| Indicator | Value |
|---|---|
| Project power | 33.825 |

Sources: <https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21854> · Download data: [JSON](https://newsverum.com/api/v1/articles/los-campillos-solar-hybrid-permit-denied-2026/data/project-capacity?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/los-campillos-solar-hybrid-permit-denied-2026/data/project-capacity?lang=en&format=csv)

## Sources

- [Boletín Oficial del Estado (BOE)](<https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21854>) (Source checked: 2026-10-21; Published: 2026-10-20)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
