# Lodestar reports silver-gold drilling results at Nevada’s Black Diamond

> Two holes returned silver-bearing intervals of 15.2 m and 12.2 m; the company also reported lead and zinc values.

- Canonical URL: https://newsverum.com/en/news/lodestar-gold-run-black-diamond-silver-drilling-2026
- Publisher: Newsverum
- Section: Economy
- Country: United States
- Published: 2026-10-15T17:36:41+00:00
- Updated: 2026-10-15T17:36:41+00:00
- Event / data period: 2026-10-14
- Other editions: [Türkçe](https://newsverum.com/tr/news/lodestar-gold-run-black-diamond-silver-drilling-2026.md), [العربية](https://newsverum.com/ar/news/lodestar-gold-run-black-diamond-silver-drilling-2026.md), [Français](https://newsverum.com/fr/news/lodestar-gold-run-black-diamond-silver-drilling-2026.md), [Español](https://newsverum.com/es/news/lodestar-gold-run-black-diamond-silver-drilling-2026.md), [Deutsch](https://newsverum.com/de/news/lodestar-gold-run-black-diamond-silver-drilling-2026.md), [Português](https://newsverum.com/pt/news/lodestar-gold-run-black-diamond-silver-drilling-2026.md)

Lodestar Metals released assays from eight additional reverse-circulation holes at the Black Diamond target within its Gold Run project in Nevada. The company reported 15.2 metres starting at 50.3 metres downhole in LSRC13 with 79.5 g/t silver and 0.20 g/t gold; LSRC14 returned 12.2 metres from 48.8 metres downhole with 85.6 g/t silver and 0.12 g/t gold.

Some intervals also contained reported lead and zinc. The company said drilling had intersected mineralization over a structural zone of approximately 850 metres; this is its geological interpretation of company-reported drill data. Reported intervals are downhole lengths, and assays from two Crown North holes were still pending. No silver-equivalent calculations are used here.

## Data

### Selected direct assays at Black Diamond

Company-reported downhole intervals; no equivalent grade is used.

Methodology: The table reproduces reported measurements and results from the primary announcement; it is not an independent resource estimate or economic assessment.

| Hole | Downhole interval (m) | Silver (g/t) | Gold (g/t) | Lead (%) | Zinc (%) |
|---|---|---|---|---|---|
| LSRC13 | 15.2 | 79.5 | 0.2 | 0.25 | 0.44 |
| LSRC14 | 12.2 | 85.6 | 0.12 | 0.19 | 0.19 |

Sources: <https://www.newsfilecorp.com/release/318718/Lodestar-Metals-Intersects-15.2-m-of-102.2-gt-AgEq-Including-1.5-m-of-431.1-gt-AgEq-at-Black-Diamond-Gold-Run-Project-Nevada> · Download data: [JSON](https://newsverum.com/api/v1/articles/lodestar-gold-run-black-diamond-silver-drilling-2026/data/black-diamond-direct-assays?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/lodestar-gold-run-black-diamond-silver-drilling-2026/data/black-diamond-direct-assays?lang=en&format=csv)

## Sources

- [Lodestar Metals Corp. (company announcement)](<https://www.newsfilecorp.com/release/318718/Lodestar-Metals-Intersects-15.2-m-of-102.2-gt-AgEq-Including-1.5-m-of-431.1-gt-AgEq-at-Black-Diamond-Gold-Run-Project-Nevada>) (Source checked: 2026-10-15; Published: 2026-10-14)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
