# Lamprell wins ONGC’s 285-kilometre pipeline replacement work

> Contractor with Dubai operations will execute the Indian project.

- Canonical URL: https://newsverum.com/en/news/lamprell-wins-ongcs-285-kilometre-pipeline-replacement-work
- Publisher: Newsverum
- Section: Energy
- Published: 2026-10-02T21:09:51+03:00
- Updated: 2026-10-07T00:50:47+03:00
- Event / data period: 2026-03-05
- Other editions: [Türkçe](https://newsverum.com/tr/news/lamprell-wins-ongcs-285-kilometre-pipeline-replacement-work.md), [العربية](https://newsverum.com/ar/news/lamprell-wins-ongcs-285-kilometre-pipeline-replacement-work.md), [Français](https://newsverum.com/fr/news/lamprell-wins-ongcs-285-kilometre-pipeline-replacement-work.md), [Español](https://newsverum.com/es/news/lamprell-wins-ongcs-285-kilometre-pipeline-replacement-work.md), [Deutsch](https://newsverum.com/de/news/lamprell-wins-ongcs-285-kilometre-pipeline-replacement-work.md), [Português](https://newsverum.com/pt/news/lamprell-wins-ongcs-285-kilometre-pipeline-replacement-work.md)

Lamprell’s March 5 announcement reports replacement and laying of approximately 285 kilometres of subsea pipelines under ONGC PRP-IX in India’s western offshore fields.

Scope also includes platform modifications. Dubai relevance comes from Jebel Ali operations; the project location remains India. Existing infrastructure connections require clear delivery boundaries.

## Sources

- [Lamprell](<https://www.lamprell.com/2026/03/05/lamprell-appointed-for-ongcs-pipeline-replacement-project-prp-ix/>) (Source checked: 2026-10-02; Published: 2026-03-05)

## Correction history

- 2026-10-06T21:56:19+03:00: The missing language translations for this article have been added.
- 2026-10-07T00:50:47+03:00: German and Portuguese editions and translations of the data and correction explanations have been added to this article.

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
