# Alabama gives Kiewit Massman Traylor notice to proceed on Mobile River Bridge

> ALDOT issued a notice to proceed on 25 September 2026 to the Kiewit Massman Traylor design-build team for the Mobile River Bridge and Bayway project, which the governor’s office put at $3.2 billion in construction cost.

- Canonical URL: https://newsverum.com/en/news/kiewit-massman-traylor-mobile-river-bridge-notice-to-proceed-september-2026
- Publisher: Newsverum
- Section: Infrastructure
- Country: United States
- Published: 2026-10-05T09:37:37+00:00
- Updated: 2026-10-07T00:51:27+03:00
- Event / data period: 2026-09-25
- Other editions: [Türkçe](https://newsverum.com/tr/news/kiewit-massman-traylor-mobile-river-bridge-notice-to-proceed-september-2026.md), [العربية](https://newsverum.com/ar/news/kiewit-massman-traylor-mobile-river-bridge-notice-to-proceed-september-2026.md), [Français](https://newsverum.com/fr/news/kiewit-massman-traylor-mobile-river-bridge-notice-to-proceed-september-2026.md), [Español](https://newsverum.com/es/news/kiewit-massman-traylor-mobile-river-bridge-notice-to-proceed-september-2026.md), [Deutsch](https://newsverum.com/de/news/kiewit-massman-traylor-mobile-river-bridge-notice-to-proceed-september-2026.md), [Português](https://newsverum.com/pt/news/kiewit-massman-traylor-mobile-river-bridge-notice-to-proceed-september-2026.md)

On 25 September 2026, the Alabama Department of Transportation (ALDOT), acting for the Alabama Toll Road, Bridge and Tunnel Authority, issued a notice to proceed to the Kiewit Massman Traylor (KMT) design-build team for the Mobile River Bridge and Bayway project on Interstate 10. Governor Kay Ivey announced on 29 September 2026 that she had formally authorized the start of construction. Her office described the project, with a construction cost of $3.2 billion, as the largest transportation infrastructure project in Alabama history.

The governor’s office said the notice followed the close of bond sales and federal financing earlier in September and was the final procedural step before construction. On 2 October 2026, ALDOT said state, federal and local leaders broke ground at Cooper Riverside Park in downtown Mobile, and that KMT had begun mobilizing after the notice to proceed. Governor Ivey was joined by U.S. Transportation Secretary Sean P. Duffy.

ALDOT described the $3.2 billion Phase One as a new six-lane, cable-stayed Mobile River Bridge, improvements to key interchanges and traffic flow, and restriping of the existing Bayway to provide six lanes of capacity across Mobile Bay. A new Bayway structure is planned for a future phase. ALDOT said construction is expected to take five years. Neither source states the design-build contract price.

## Data

### Construction cost and scope

Construction cost, lane counts and expected construction time stated by the Alabama governor’s office and ALDOT.

Methodology: The $3.2 billion figure is the construction cost stated by the governor’s office, and ALDOT applies it to Phase One. The sources do not state KMT’s design-build contract price. Lane counts and the five-year construction period describe planned scope and expected duration, not completed work.

| label | value | unit | period | basis |
|---|---|---|---|---|
| Construction cost | 3.2 | billion USD | 2026-09-29 | observed |
| Lanes on the new cable-stayed Mobile River Bridge | 6 | lanes | 2026-10-02 | target |
| Lanes of capacity across Mobile Bay after Bayway restriping | 6 | lanes | 2026-10-02 | target |
| Expected construction duration | 5 | years | 2026-10-02 | target |

Sources: <https://governor.alabama.gov/newsroom/2026/09/governor-ivey-authorizes-construction-for-major-mobile-river-bridge-and-bayway-project-sets-groundbreaking-date/>, <https://aldotnews.com/2026/10/02/mobile-river-bridge-bayway-groundbreaking/> · Download data: [JSON](https://newsverum.com/api/v1/articles/kiewit-massman-traylor-mobile-river-bridge-notice-to-proceed-september-2026/data/construction-cost-and-scope?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/kiewit-massman-traylor-mobile-river-bridge-notice-to-proceed-september-2026/data/construction-cost-and-scope?lang=en&format=csv)

## Sources

- [Office of the Governor of Alabama](<https://governor.alabama.gov/newsroom/2026/09/governor-ivey-authorizes-construction-for-major-mobile-river-bridge-and-bayway-project-sets-groundbreaking-date/>) (Source checked: 2026-10-04; Published: 2026-09-29)
- [Alabama Department of Transportation (ALDOT News Hub)](<https://aldotnews.com/2026/10/02/mobile-river-bridge-bayway-groundbreaking/>) (Source checked: 2026-10-04; Published: 2026-10-02)

## Correction history

- 2026-10-07T00:51:27+03:00: German and Portuguese editions and translations of the data and correction explanations have been added to this article.

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
