# KBR selected for Keppel–Aster SAF technology and FEED

> Singapore project announcement covers PureSAF licensing and front-end engineering.

- Canonical URL: https://newsverum.com/en/news/kbr-selected-for-keppelaster-saf-technology-and-feed
- Publisher: Newsverum
- Section: Energy
- Published: 2026-10-02T21:09:51+03:00
- Updated: 2026-10-07T00:54:37+03:00
- Event / data period: 2026-06-29
- Other editions: [Türkçe](https://newsverum.com/tr/news/kbr-selected-for-keppelaster-saf-technology-and-feed.md), [العربية](https://newsverum.com/ar/news/kbr-selected-for-keppelaster-saf-technology-and-feed.md), [Français](https://newsverum.com/fr/news/kbr-selected-for-keppelaster-saf-technology-and-feed.md), [Español](https://newsverum.com/es/news/kbr-selected-for-keppelaster-saf-technology-and-feed.md), [Deutsch](https://newsverum.com/de/news/kbr-selected-for-keppelaster-saf-technology-and-feed.md), [Português](https://newsverum.com/pt/news/kbr-selected-for-keppelaster-saf-technology-and-feed.md)

KBR said on June 29 that it was selected for PureSAF technology licensing and FEED services for Keppel and Aster’s Jurong Island SAF project.

This stage is not the plant’s full EPC construction contract. Planned production remains subject to final investment decision and regulatory approvals; a front-end engineering selection does not establish a completed or operating factory.

## Sources

- [KBR](<https://www.kbr.com/en-gb/node/11839>) (Source checked: 2026-10-02; Published: 2026-06-29)

## Correction history

- 2026-10-06T21:57:01+03:00: The missing language translations for this article have been added.
- 2026-10-07T00:54:37+03:00: German and Portuguese editions and translations of the data and correction explanations have been added to this article.

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
