# Jordan opens prequalification for 450 MW Mujib pumped-storage project

> The announced design provides 450 MW of capacity and seven hours of storage, with the ministry seeking a private-sector partner.

- Canonical URL: https://newsverum.com/en/news/jordan-mujib-pumped-storage-prequalification-450mw
- Publisher: Newsverum
- Section: Energy
- Country: Jordan
- Published: 2026-10-16T10:36:24+00:00
- Updated: 2026-10-16T10:36:24+00:00
- Event / data period: 2026-10-15
- Other editions: [Türkçe](https://newsverum.com/tr/news/jordan-mujib-pumped-storage-prequalification-450mw.md), [العربية](https://newsverum.com/ar/news/jordan-mujib-pumped-storage-prequalification-450mw.md), [Français](https://newsverum.com/fr/news/jordan-mujib-pumped-storage-prequalification-450mw.md), [Español](https://newsverum.com/es/news/jordan-mujib-pumped-storage-prequalification-450mw.md), [Deutsch](https://newsverum.com/de/news/jordan-mujib-pumped-storage-prequalification-450mw.md), [Português](https://newsverum.com/pt/news/jordan-mujib-pumped-storage-prequalification-450mw.md)

Jordan's Investment Ministry issued a prequalification call on 15 October for the Mujib pumped-storage electricity project, to be developed in partnership with the private sector. The ministry's project description gives it a capacity of 450 megawatts and seven hours of storage.

The closed-loop system near the existing Mujib Dam is designed to reuse water between two reservoirs and use two reversible pumping and generation units rated at 225 MW each. The ministry says surplus daytime electricity would be returned to the grid during evening peaks. Energy-security and renewable-integration benefits are expected outcomes, not results already measured.

## Data

### Announced design of the Mujib pumped-storage project

Capacity and storage duration reported for the project whose prequalification call Jordan's Investment Ministry opened on 15 October 2026.

Methodology: Values are transcribed from the project description attributed to the ministry in Petra's 15 October report. They are design specifications, not operating capacity or measured storage performance.

| label | value | unit | period | basis |
|---|---|---|---|---|
| Announced project capacity | 450 | MW | 2026-10-15 | target |
| Announced storage duration | 7 | hours | 2026-10-15 | target |

Sources: <https://petra.gov.jo/en/news/investment-ministry-opens-mujib-energy-storage-prequalification%C2%A0> · Download data: [JSON](https://newsverum.com/api/v1/articles/jordan-mujib-pumped-storage-prequalification-450mw/data/jordan-mujib-pumped-storage-project-design-2026?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/jordan-mujib-pumped-storage-prequalification-450mw/data/jordan-mujib-pumped-storage-project-design-2026?lang=en&format=csv)

## Sources

- [Petra, reporting Jordan Ministry of Investment project notice](<https://petra.gov.jo/en/news/investment-ministry-opens-mujib-energy-storage-prequalification%C2%A0>) (Source checked: 2026-10-16; Published: 2026-10-15)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
