# Japan sets monitoring terms for proposed Murakami–Tainai offshore wind farm

> Japan's environment ministry submitted its opinion on 2 October on a preliminary environmental assessment for a wind project off Murakami and Tainai. The proposal comprises 46 turbines in the 15 MW class and total capacity of 690–736 MW.

- Canonical URL: https://newsverum.com/en/news/japan-environment-ministry-sets-monitoring-terms-for-murakami-tainai-offshore-wind-plan
- Publisher: Newsverum
- Section: Energy
- Country: Japan
- Published: 2026-10-04T14:04:24+00:00
- Updated: 2026-10-07T05:58:02+03:00
- Event / data period: 2026-10-02
- Other editions: [Türkçe](https://newsverum.com/tr/news/japan-environment-ministry-sets-monitoring-terms-for-murakami-tainai-offshore-wind-plan.md), [العربية](https://newsverum.com/ar/news/japan-environment-ministry-sets-monitoring-terms-for-murakami-tainai-offshore-wind-plan.md), [Français](https://newsverum.com/fr/news/japan-environment-ministry-sets-monitoring-terms-for-murakami-tainai-offshore-wind-plan.md), [Español](https://newsverum.com/es/news/japan-environment-ministry-sets-monitoring-terms-for-murakami-tainai-offshore-wind-plan.md), [Deutsch](https://newsverum.com/de/news/japan-environment-ministry-sets-monitoring-terms-for-murakami-tainai-offshore-wind-plan.md), [Português](https://newsverum.com/pt/news/japan-environment-ministry-sets-monitoring-terms-for-murakami-tainai-offshore-wind-plan.md)

The ministry asks the developer to specify post-construction monitoring, including underwater-noise propagation during operation and rapid detection of possible migratory-bird collisions. If serious effects are identified, additional conservation measures should be considered with expert advice.

The proposed site off Niigata Prefecture covers about 9,242 hectares. The opinion is not an operating approval: the developer must still prepare the final environmental assessment document taking national and local opinions into account.

## Data

### Murakami–Tainai offshore wind proposal

Project scale in the environment ministry's assessment review. Figures describe a proposal, not installed capacity.

Methodology: Project scale in the environment ministry's assessment review. Figures describe a proposal, not installed capacity.

| label | value | unit | period | basis |
|---|---|---|---|---|
| Lower bound of proposed capacity | 690 | MW | 2026-10-02 | estimate |
| Upper bound of proposed capacity | 736 | MW | 2026-10-02 | estimate |
| Proposed turbines in the 15 MW class | 46 | count | 2026-10-02 | estimate |
| Approximate assessment area | 9242 | hectares | 2026-10-02 | estimate |

Sources: <https://www.env.go.jp/press/press_05601.html> · Download data: [JSON](https://newsverum.com/api/v1/articles/japan-environment-ministry-sets-monitoring-terms-for-murakami-tainai-offshore-wind-plan/data/murakami-tainai-proposal?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/japan-environment-ministry-sets-monitoring-terms-for-murakami-tainai-offshore-wind-plan/data/murakami-tainai-proposal?lang=en&format=csv)

## Sources

- [Ministry of the Environment, Government of Japan](<https://www.env.go.jp/press/press_05601.html>) (Source checked: 2026-10-04; Published: 2026-10-02)

## Correction history

- 2026-10-04T17:11:11+03:00: French text mistakenly placed in the Turkish edition was replaced with its Turkish translation. Source facts and the first-publication time are unchanged.
- 2026-10-07T00:52:36+03:00: German and Portuguese editions and translations of the data and correction explanations have been added to this article.
- 2026-10-07T05:58:02+03:00: Data classification corrected: measure identifiers and types now follow the dataset rules. No figure, unit or date changed.

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
