# Bidboland maintenance work completed

> Iran’s Bidboland Gas Refinery said it completed its annual major maintenance programme before winter. Process units, compressors, instrumentation and transfer lines were inspected and maintained.

- Canonical URL: https://newsverum.com/en/news/iran-bidboland-refinery-overhaul-energy-savings
- Publisher: Newsverum
- Section: Energy
- Country: Iran
- Published: 2026-10-15T08:58:14+00:00
- Updated: 2026-10-15T08:58:14+00:00
- Source review period: 2026-10-14
- Other editions: [Türkçe](https://newsverum.com/tr/news/iran-bidboland-refinery-overhaul-energy-savings.md), [العربية](https://newsverum.com/ar/news/iran-bidboland-refinery-overhaul-energy-savings.md), [Français](https://newsverum.com/fr/news/iran-bidboland-refinery-overhaul-energy-savings.md), [Español](https://newsverum.com/es/news/iran-bidboland-refinery-overhaul-energy-savings.md), [Deutsch](https://newsverum.com/de/news/iran-bidboland-refinery-overhaul-energy-savings.md), [Português](https://newsverum.com/pt/news/iran-bidboland-refinery-overhaul-energy-savings.md)

*The source does not state the event date; the period shown is the source review period.*

Iran’s Bidboland Gas Refinery said it completed its annual major maintenance programme before winter. Process units, compressors, instrumentation and transfer lines were inspected and maintained.

It also reported avoiding 500,000 cubic metres of gas use and reducing CO₂ emissions by 1,000 tonnes. The report gives no measurement period or calculation method, so these are attributed company-reported results.

## Data

### Reported energy development

Iran’s Bidboland Gas Refinery said it completed its annual major maintenance programme before winter. Process units, compressors, instrumentation and transfer lines were inspected and maintained.

Methodology: Figures and operational details from the company account cited by Shana are summarized; estimates or unspecified measurement periods are identified.

| date | label | description | status |
|---|---|---|---|
| 2026-10-14 | Bidboland maintenance work completed | Iran’s Bidboland Gas Refinery said it completed its annual major maintenance programme before winter. Process units, compressors, instrumentation and transfer lines were inspected and maintained. | occurred |

Sources: <https://www.shana.ir/news/3031499/> · Download data: [JSON](https://newsverum.com/api/v1/articles/iran-bidboland-refinery-overhaul-energy-savings/data/reported-energy-development?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/iran-bidboland-refinery-overhaul-energy-savings/data/reported-energy-development?lang=en&format=csv)

## Sources

- [Shana, citing Bidboland Gas Refinery](<https://www.shana.ir/news/3031499/>) (Source checked: 2026-10-15; Published: 2026-10-14)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
