# Guinea’s FOSTER fertilizer project is planned for seven prefectures from 2027

> The three-year plan includes credit-based fertilizer distribution for smallholders and soil-health work.

- Canonical URL: https://newsverum.com/en/news/guinea-foster-fertilizer-project-plans-credit-supply-in-seven-prefectures
- Publisher: Newsverum
- Section: Agriculture
- Country: Guinea
- Published: 2026-10-21T00:44:01+00:00
- Updated: 2026-10-21T00:44:01+00:00
- Event / data period: 2027-03-01
- Other editions: [Türkçe](https://newsverum.com/tr/news/guinea-foster-fertilizer-project-plans-credit-supply-in-seven-prefectures.md), [العربية](https://newsverum.com/ar/news/guinea-foster-fertilizer-project-plans-credit-supply-in-seven-prefectures.md), [Français](https://newsverum.com/fr/news/guinea-foster-fertilizer-project-plans-credit-supply-in-seven-prefectures.md), [Español](https://newsverum.com/es/news/guinea-foster-fertilizer-project-plans-credit-supply-in-seven-prefectures.md), [Deutsch](https://newsverum.com/de/news/guinea-foster-fertilizer-project-plans-credit-supply-in-seven-prefectures.md), [Português](https://newsverum.com/pt/news/guinea-foster-fertilizer-project-plans-credit-supply-in-seven-prefectures.md)

An African Development Bank project summary dated 17 October says Guinea’s FOSTER fertilizer value-chain project is scheduled to run from 1 March 2027 to 28 February 2030. It plans a distribution network and fertilizer credit for smallholders in Kindia, Mamou, Dabola, Kouroussa, Kankan, Siguiri and Mandiana.

The project focuses on rice, maize, fonio and horticulture. The Africa Fertilizer Financing Mechanism is to cover 50% of losses from defaults on fertilizer credit through EKAP; the plan targets about 16,200 tonnes of fertilizer credit. It also proposes 5,000 soil analyses and training for 300 agripreneurs. These are future project targets, not achieved outputs.

## Data

### FOSTER: planned schedule and targets

Project planned across seven prefectures for three years.

Methodology: Schedule, target areas and metrics transcribed from project summary; figures are future targets, not completed outputs.

| date | label | description | status |
|---|---|---|---|
| 2027-03-01 | Implementation scheduled to begin | Implementation is scheduled for 1 March 2027 to 28 February 2030. | scheduled |

Sources: <https://www.afdb.org/en/documents/guinea-fostering-africas-agricultural-productivity-97594> · Download data: [JSON](https://newsverum.com/api/v1/articles/guinea-foster-fertilizer-project-plans-credit-supply-in-seven-prefectures/data/source-event?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/guinea-foster-fertilizer-project-plans-credit-supply-in-seven-prefectures/data/source-event?lang=en&format=csv)

## Sources

- [African Development Bank Group](<https://www.afdb.org/en/documents/guinea-fostering-africas-agricultural-productivity-97594>) (Source checked: 2026-10-21; Published: 2026-10-17)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
