# Guardian completes 2026 exploration program at Mount Cameron, Yukon

> Guardian completed its 2026 field program at the Mount Cameron project in Yukon. Work included four first-ever drill holes at Clark, sampling at Marten, airborne geophysics and LiDAR; assays remain pending.

- Canonical URL: https://newsverum.com/en/news/guardian-mount-cameron-completes-2026-exploration-program-yukon
- Publisher: Newsverum
- Section: Business
- Country: Canada
- Published: 2026-10-20T23:01:22+00:00
- Updated: 2026-10-20T23:01:22+00:00
- Event / data period: 2026-10-20
- Other editions: [Türkçe](https://newsverum.com/tr/news/guardian-mount-cameron-completes-2026-exploration-program-yukon.md), [العربية](https://newsverum.com/ar/news/guardian-mount-cameron-completes-2026-exploration-program-yukon.md), [Français](https://newsverum.com/fr/news/guardian-mount-cameron-completes-2026-exploration-program-yukon.md), [Español](https://newsverum.com/es/news/guardian-mount-cameron-completes-2026-exploration-program-yukon.md), [Deutsch](https://newsverum.com/de/news/guardian-mount-cameron-completes-2026-exploration-program-yukon.md), [Português](https://newsverum.com/pt/news/guardian-mount-cameron-completes-2026-exploration-program-yukon.md)

The release says four diamond drill holes, CL26-01 to CL26-04, totalled 338.5 metres at Clark. At Marten, a shear zone exposed at least 4.5 metres across at surface was cleaned, mapped and chip sampled; its true thickness is unknown.

The company also reported a 669-line-kilometre airborne magnetic and radiometric survey and a 12 km² LiDAR survey. Laboratory results from drilling, outcrop and historical core samples had not yet been reported; visual geological observations are not assays.

## Data

### Guardian completes 2026 exploration program at Mount Cameron, Yukon

Methodology: This record summarizes completed work reported in the company release of October 20, 2026. Surface width is not true thickness; assays are pending.

| date | label | description | status |
|---|---|---|---|
| 2026-10-20 | Guardian completes 2026 exploration program at Mount Cameron, Yukon | Guardian completed its 2026 field program at the Mount Cameron project in Yukon. Work included four first-ever drill holes at Clark, sampling at Marten, airborne geophysics and LiDAR; assays remain pending. | occurred |

Sources: <https://www.newsfilecorp.com/release/319935/> · Download data: [JSON](https://newsverum.com/api/v1/articles/guardian-mount-cameron-completes-2026-exploration-program-yukon/data/mount-cameron-2026-field-program?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/guardian-mount-cameron-completes-2026-exploration-program-yukon/data/mount-cameron-2026-field-program?lang=en&format=csv)

### Clark completed drilling

Drilling length Guardian reported completing in its 2026 field program.

Methodology: Four diamond holes totalled 338.5 metres; assays are pending.

| Scope | Metres | Completed drill holes |
|---|---|---|
| Four completed diamond drill holes | 338.5 | 4 |

Sources: <https://www.newsfilecorp.com/release/319935/> · Download data: [JSON](https://newsverum.com/api/v1/articles/guardian-mount-cameron-completes-2026-exploration-program-yukon/data/mount-cameron-completed-drill-metres?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/guardian-mount-cameron-completes-2026-exploration-program-yukon/data/mount-cameron-completed-drill-metres?lang=en&format=csv)

## Sources

- [Guardian Exploration via Newsfile Corp.](<https://www.newsfilecorp.com/release/319935/>) (Source checked: 2026-10-20; Published: 2026-10-20)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
