# GE Vernova to supply seven turbines for Eurus Energy in Japan

> Hiyamizutouge’s planned wind capacity is 29.4 MW.

- Canonical URL: https://newsverum.com/en/news/ge-vernova-to-supply-seven-turbines-for-eurus-energy-in-japan
- Publisher: Newsverum
- Section: Energy
- Published: 2026-10-02T16:15:41+03:00
- Updated: 2026-10-07T00:56:21+03:00
- Event / data period: 2026-09-15
- Other editions: [Türkçe](https://newsverum.com/tr/news/ge-vernova-to-supply-seven-turbines-for-eurus-energy-in-japan.md), [العربية](https://newsverum.com/ar/news/ge-vernova-to-supply-seven-turbines-for-eurus-energy-in-japan.md), [Français](https://newsverum.com/fr/news/ge-vernova-to-supply-seven-turbines-for-eurus-energy-in-japan.md), [Español](https://newsverum.com/es/news/ge-vernova-to-supply-seven-turbines-for-eurus-energy-in-japan.md), [Deutsch](https://newsverum.com/de/news/ge-vernova-to-supply-seven-turbines-for-eurus-energy-in-japan.md), [Português](https://newsverum.com/pt/news/ge-vernova-to-supply-seven-turbines-for-eurus-energy-in-japan.md)

GE Vernova announced on September 15 an agreement to supply seven 4.2 MW turbines for Eurus Energy’s Hiyamizutouge wind project in Japan. The order was booked in the second quarter.

The Aomori project has planned capacity of 29.4 MW. The agreement includes two years of services and a two-year extension option. This describes a supply arrangement rather than a commissioned wind farm.

## Sources

- [GE Vernova](<https://www.gevernova.com/news/press-releases/ge-vernova-supply-294-mw-wind-capacity-eurus-energys-hiyamizutouge-project-japan>) (Source checked: 2026-10-02)

## Correction history

- 2026-10-06T21:56:14+03:00: The missing language translations for this article have been added.
- 2026-10-07T00:56:21+03:00: German and Portuguese editions and translations of the data and correction explanations have been added to this article.

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
