# Fujifilm to invest $18 million in Arizona semiconductor slurry capacity

> The company plans to expand copper interconnect CMP slurry production and add multi-product facilities at its Mesa, Arizona site, with the line scheduled to start in 2027.

- Canonical URL: https://newsverum.com/en/news/fujifilm-mesa-cmp-slurry-capacity-expansion-2026
- Publisher: Newsverum
- Section: Business
- Country: United States
- Published: 2026-10-15T20:48:36+00:00
- Updated: 2026-10-15T20:48:36+00:00
- Source review period: 2026-10-13
- Other editions: [Türkçe](https://newsverum.com/tr/news/fujifilm-mesa-cmp-slurry-capacity-expansion-2026.md), [العربية](https://newsverum.com/ar/news/fujifilm-mesa-cmp-slurry-capacity-expansion-2026.md), [Français](https://newsverum.com/fr/news/fujifilm-mesa-cmp-slurry-capacity-expansion-2026.md), [Español](https://newsverum.com/es/news/fujifilm-mesa-cmp-slurry-capacity-expansion-2026.md), [Deutsch](https://newsverum.com/de/news/fujifilm-mesa-cmp-slurry-capacity-expansion-2026.md), [Português](https://newsverum.com/pt/news/fujifilm-mesa-cmp-slurry-capacity-expansion-2026.md)

*The source does not state the event date; the period shown is the source review period.*

Fujifilm said on October 13 that it will invest $18 million in semiconductor materials production at its Mesa, Arizona site. The project expands capacity for copper interconnect chemical mechanical planarization (CMP) slurries and adds facilities able to make multiple slurry products for front-end, middle-of-line and advanced packaging processes, including hybrid bonding.

The expanded line is scheduled to begin operations in 2027. Fujifilm said the facilities will connect product development at its Arizona CMP research centre with commercial manufacturing; the announcement gives no production-volume target. The investment is a planned capacity expansion, not evidence that the new line is already operating.

## Data

### Fujifilm's Mesa investment plan

Investment amount and planned start date reported in the announcement.

Methodology: Transcribed from the company announcement; no production volume was disclosed.

| date | label | description | status |
|---|---|---|---|
| 2026-10-13 | $18 million investment | CMP slurry capacity at Mesa is planned to expand, with the line scheduled to start in 2027. | occurred |

Sources: <https://newsroom-us.fujifilm.com/press-releases/press-release-details/2026/Fujifilm-to-Expand-CMP-Slurry-Production-Capacity-in-the-United-States/default.aspx> · Download data: [JSON](https://newsverum.com/api/v1/articles/fujifilm-mesa-cmp-slurry-capacity-expansion-2026/data/company-release?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/fujifilm-mesa-cmp-slurry-capacity-expansion-2026/data/company-release?lang=en&format=csv)

## Sources

- [FUJIFILM Corporation](<https://newsroom-us.fujifilm.com/press-releases/press-release-details/2026/Fujifilm-to-Expand-CMP-Slurry-Production-Capacity-in-the-United-States/default.aspx>) (Source checked: 2026-10-15; Published: 2026-10-13)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
