# FuelCell system receives 99.873% PJM capacity assessment for 2028/29

> The unit-specific ELCC result is not an uptime measure or a technology-class rating.

- Canonical URL: https://newsverum.com/en/news/fuelcell-energy-pjm-unit-capacity-assessment-99-873-percent
- Publisher: Newsverum
- Section: Business
- Country: United States
- Published: 2026-10-21T14:40:05+00:00
- Updated: 2026-10-21T14:40:05+00:00
- Event / data period: 2026-10-21
- Other editions: [Türkçe](https://newsverum.com/tr/news/fuelcell-energy-pjm-unit-capacity-assessment-99-873-percent.md), [العربية](https://newsverum.com/ar/news/fuelcell-energy-pjm-unit-capacity-assessment-99-873-percent.md), [Français](https://newsverum.com/fr/news/fuelcell-energy-pjm-unit-capacity-assessment-99-873-percent.md), [Español](https://newsverum.com/es/news/fuelcell-energy-pjm-unit-capacity-assessment-99-873-percent.md), [Deutsch](https://newsverum.com/de/news/fuelcell-energy-pjm-unit-capacity-assessment-99-873-percent.md), [Português](https://newsverum.com/pt/news/fuelcell-energy-pjm-unit-capacity-assessment-99-873-percent.md)

FuelCell Energy said on 21 October that its FuelCell Energy Block System received a 99.873% rating in PJM Interconnection’s unit-specific Effective Load Carrying Capability assessment for the 2028/29 Reliability Backstop Procurement process. The company said PJM may count nearly all of the evaluated system’s capacity as dependable.

The assessment applies to the particular system evaluated; FuelCell stressed that it is neither a rating for the company’s technology class nor a measure of operating uptime. Future assessments may differ, and any market participation would remain subject to PJM processes and eligibility rules. The company cited PJM’s projection of 32 GW of peak load growth across its region from 2024 to 2030, with about 30 GW expected from data centers.

## Data

### PJM unit assessment

The system-specific score reported by FuelCell for the PJM 2028/29 procurement process.

Methodology: Score reported in PJM’s unit-specific ELCC assessment; the percentage is specific to the 2028/29 process and is not uptime or fleet-wide performance.

| label | value | unit | period | basis |
|---|---|---|---|---|
| PJM ELCC rating | 99.873 | percent | 2026-10-21 | estimate |

Sources: <https://rss.globenewswire.com/news-release/2026/10/21/3385536/8041/en/fuelcell-energy-block-system-receives-99-873-pjm-capacity-rating-as-demand-grows-for-on-site-power.html> · Download data: [JSON](https://newsverum.com/api/v1/articles/fuelcell-energy-pjm-unit-capacity-assessment-99-873-percent/data/pjm-unit-assessment?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/fuelcell-energy-pjm-unit-capacity-assessment-99-873-percent/data/pjm-unit-assessment?lang=en&format=csv)

## Sources

- [FuelCell Energy, Inc.](<https://rss.globenewswire.com/news-release/2026/10/21/3385536/8041/en/fuelcell-energy-block-system-receives-99-873-pjm-capacity-rating-as-demand-grows-for-on-site-power.html>) (Source checked: 2026-10-21; Published: 2026-10-21)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
