# ENPRODE’s BIM and Aconex approach: model and data sharing in EPC projects

> The announcement describes BIM manager Deniz Asar’s presentation on information sharing between stakeholders.

- Canonical URL: https://newsverum.com/en/news/enprodes-bim-and-aconex-approach-model-and-data-sharing-in-epc-projects
- Publisher: Newsverum
- Section: Business
- Published: 2026-10-02T21:09:51+03:00
- Updated: 2026-10-12T06:28:22+03:00
- Source review period: 2026-10
- Other editions: [Türkçe](https://newsverum.com/tr/news/enprodes-bim-and-aconex-approach-model-and-data-sharing-in-epc-projects.md), [العربية](https://newsverum.com/ar/news/enprodes-bim-and-aconex-approach-model-and-data-sharing-in-epc-projects.md), [Français](https://newsverum.com/fr/news/enprodes-bim-and-aconex-approach-model-and-data-sharing-in-epc-projects.md), [Español](https://newsverum.com/es/news/enprodes-bim-and-aconex-approach-model-and-data-sharing-in-epc-projects.md), [Deutsch](https://newsverum.com/de/news/enprodes-bim-and-aconex-approach-model-and-data-sharing-in-epc-projects.md), [Português](https://newsverum.com/pt/news/enprodes-bim-and-aconex-approach-model-and-data-sharing-in-epc-projects.md)

*The source does not state the event date; the period shown is the source review period.*

ENPRODE reports that BIM manager Deniz Asar presented model and data sharing at an Oracle Aconex event. The account describes international stakeholder collaboration and a presentation of the company’s award-linked BIM implementation.

The subject is engineering information management, not a new plant order. Planning and site interfaces within ENPRODE’s stated EPC services are areas where consistent design information across disciplines matters.

A presentation about BIM should be distinguished from demonstrated performance. The source provides no measured cost-saving percentage, error-reduction rate, licence count or project delivery-time improvement. Those results cannot be inferred from the announcement.

Because the event’s precise date is not stated, the displayed period is the source review period. Newsverum publishes this as an ENPRODE digital project-management archive review, without assuming technical architecture or commercial terms missing from the written account.

## Sources

- [ENPRODE — corporate news archive](<https://www.enprode.com/News/News-aconex>) (Source checked: 2026-10-02)
- [ENPRODE — Engineering Procurement & Construction](<https://www.enprode.com/services/Engineering-Procurement-Construction>) (Source checked: 2026-10-02)

## Correction history

- 2026-10-06T21:57:25+03:00: The missing language translations for this article have been added.
- 2026-10-07T00:56:18+03:00: German and Portuguese editions and translations of the data and correction explanations have been added to this article.
- 2026-10-12T06:28:22+03:00: Wording in this article's language editions was corrected to retain the article's full information and scope.

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
