# Sea Link electricity connection between Suffolk and Kent receives approval

> The UK government approved Sea Link, a planned electricity transmission connection between Suffolk and Kent in England, on 30 October. Developed by National Grid and running mainly offshore, the link is designed to carry 2 GW of power.

- Canonical URL: https://newsverum.com/en/news/england-sea-link-suffolk-kent-development-consent-2026
- Publisher: Newsverum
- Section: Energy
- Country: United Kingdom
- Published: 2026-10-31T02:11:04+00:00
- Updated: 2026-10-31T02:11:04+00:00
- Event / data period: 2026-10-30
- Other editions: [Türkçe](https://newsverum.com/tr/news/england-sea-link-suffolk-kent-development-consent-2026.md), [العربية](https://newsverum.com/ar/news/england-sea-link-suffolk-kent-development-consent-2026.md), [Français](https://newsverum.com/fr/news/england-sea-link-suffolk-kent-development-consent-2026.md), [Español](https://newsverum.com/es/news/england-sea-link-suffolk-kent-development-consent-2026.md), [Deutsch](https://newsverum.com/de/news/england-sea-link-suffolk-kent-development-consent-2026.md), [Português](https://newsverum.com/pt/news/england-sea-link-suffolk-kent-development-consent-2026.md)

The energy department says that capacity is equivalent to the electricity needs of 2 million homes. The project is intended to relieve network constraints and reduce payments to generators when the grid cannot transport their output. These are projected benefits of the approved infrastructure, rather than evidence that it is already operating.

National Grid will deliver community-benefit funds of more than £1 million each for Kent and Suffolk under the government scheme. Potential uses include community facilities, green spaces and local skills. The announcement concerns development approval and intended benefits, rather than an EPC contract award or a confirmed reduction in individual electricity bills.

## Data

### Source publication

Publication of the official announcement on 30 October 2026.

Methodology: The date records publication of the cited primary source. Statistical reference periods and announced future actions are identified in the article.

| date | label | description | status |
|---|---|---|---|
| 2026-10-30 | Sea Link electricity connection between Suffolk and Kent receives approval | The UK government approved Sea Link, a planned electricity transmission connection between Suffolk and Kent in England, on 30 October. Developed by National Grid and running mainly offshore, the link is designed to carry 2 GW of power. | occurred |

Sources: <https://www.gov.uk/government/news/major-undersea-power-cable-given-green-light> · Download data: [JSON](https://newsverum.com/api/v1/articles/england-sea-link-suffolk-kent-development-consent-2026/data/source-announcement?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/england-sea-link-suffolk-kent-development-consent-2026/data/source-announcement?lang=en&format=csv)

## Sources

- [Department for Energy Security and Net Zero, United Kingdom](<https://www.gov.uk/government/news/major-undersea-power-cable-given-green-light>) (Source checked: 2026-10-31; Published: 2026-10-30)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
