# EDF begins energizing its first transmission asset in Brazil

> Sectionalizing the first Campos–GNA circuit began integration of EDF’s Açu Transmissora asset into Brazil’s national grid.

- Canonical URL: https://newsverum.com/en/news/edf-brazil-campos-gna-transmission-first-energization-2026
- Publisher: Newsverum
- Section: Energy
- Country: Brazil
- Published: 2026-10-15T20:19:53+00:00
- Updated: 2026-10-15T20:19:53+00:00
- Event / data period: 2026-10-13
- Other editions: [Türkçe](https://newsverum.com/tr/news/edf-brazil-campos-gna-transmission-first-energization-2026.md), [العربية](https://newsverum.com/ar/news/edf-brazil-campos-gna-transmission-first-energization-2026.md), [Français](https://newsverum.com/fr/news/edf-brazil-campos-gna-transmission-first-energization-2026.md), [Español](https://newsverum.com/es/news/edf-brazil-campos-gna-transmission-first-energization-2026.md), [Deutsch](https://newsverum.com/de/news/edf-brazil-campos-gna-transmission-first-energization-2026.md), [Português](https://newsverum.com/pt/news/edf-brazil-campos-gna-transmission-first-energization-2026.md)

EDF power solutions completed sectionalizing work on the first circuit of the Campos–GNA transmission line, beginning integration of its Açu Transmissora asset into Brazil’s National Interconnected System. The company announced the step on 13 October 2026.

The project was partially energized at this stage; the announcement did not say the entire asset had entered service. The facility is in the municipalities of São João da Barra and Campos dos Goytacazes. EDF described it as the first transmission asset it is integrating in the Northern Fluminense region.

## Data

### Event in the official release

Summary of the energy-sector development reported by the source.

Methodology: This is a descriptive record of the event reported by the source; it does not claim independent measurement or additional realized outcomes.

| date | label | description | status |
|---|---|---|---|
| 2026-10-13 | EDF begins energizing its first transmission asset in Brazil | Sectionalizing the first Campos–GNA circuit began integration of EDF’s Açu Transmissora asset into Brazil’s national grid. | occurred |

Sources: <https://brazil.edf-powersolutions.com/en/2026/10/13/edf-power-solutions-begins-energization-of-its-first-transmission-asset-in-the-northern-fluminense-region/> · Download data: [JSON](https://newsverum.com/api/v1/articles/edf-brazil-campos-gna-transmission-first-energization-2026/data/source-reported-energy-event?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/edf-brazil-campos-gna-transmission-first-energization-2026/data/source-reported-energy-event?lang=en&format=csv)

## Sources

- [EDF power solutions](<https://brazil.edf-powersolutions.com/en/2026/10/13/edf-power-solutions-begins-energization-of-its-first-transmission-asset-in-the-northern-fluminense-region/>) (Source checked: 2026-10-15; Published: 2026-10-13)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
