# DAERA publishes 2026 restocking grant conditions

> Northern Ireland’s 32-page booklet sets out £800-per-hectare support, species diversity, environmental permissions, payment checks and 20-year woodland obligations.

- Canonical URL: https://newsverum.com/en/news/daera-northern-ireland-woodland-investment-grant-restocking-terms-2026
- Publisher: Newsverum
- Section: Agriculture
- Country: United Kingdom
- Published: 2026-10-26T16:45:32+00:00
- Updated: 2026-10-26T16:45:32+00:00
- Event / data period: 2026-10-23
- Other editions: [Türkçe](https://newsverum.com/tr/news/daera-northern-ireland-woodland-investment-grant-restocking-terms-2026.md)

Northern Ireland’s Department of Agriculture, Environment and Rural Affairs (DAERA) published its 2026 Woodland Investment Grant information booklet on 23 October. The linked 32-page document sets out application, species-diversity, environmental and payment conditions for its Restocking support, which is intended to re-establish and restructure existing woodland. Farmers are among the eligible applicants. The booklet is not an announcement of new awards or a list of successful applicants; it is an implementation guide describing how proposals will be assessed and what funded land must meet.

The booklet sets the Restocking rate at £800 per hectare, with a minimum replanting area of one hectare and a minimum coupe size of 0.2 hectares. Projects must improve woodland diversity and climate resilience, meet UK Forestry Standard requirements and include a forest management plan. Applicants cannot begin work until they receive a final offer letter and submit the required documents.

## Support is for re-establishing existing woodland

DAERA’s publication page dated 23 October 2026 made the 2026 Woodland Investment Grant information booklet and its PDF available. The document’s title specifically identifies the Restocking option. Support is intended to restructure existing woodland through replanting, improve its ecological and environmental value and build resilience to climate change. It should therefore not be described as a general new-woodland establishment grant or a broad farm investment programme.

Eligible applicants include forest owners, farmers, landowners and estate owners, charities and local councils. Government departments and agencies are not eligible to apply directly, although a manager of government-owned land may apply if constituted as a private body, charitable organisation or council. An application can be made by the landowner or tenant; all relevant parties must be identified and sign the declaration.

Applicants need a DAERA Business ID and must provide a Forest Management Plan. The booklet says the plan should set out management objectives and proposals for the next five years, with intentions covering at least ten years. It must cover at least the area for which support is sought and follow sustainable forest-management principles. Preparing the application does not permit work to begin: operations must wait until the final offer letter is received and the required conditions and supporting documents have been accepted.

## Grant rate and area conditions

The booklet gives a Restocking Grant rate of £800 per hectare. The minimum application area to be replanted is one hectare; the minimum area for an individual restocking coupe is 0.2 hectares. Those thresholds affect how the project boundary and planting design must be shown in an application. The scheme does not support general maintenance or running costs; eligible costs may include labour and materials used for forestry operations such as plants, planting and regeneration.

Applications must meet all eligibility criteria. Projects are considered first come, first served until available resources are committed. The existence of a payment rate in the booklet therefore does not mean every eligible application will be approved or that the document announces the scheme’s total budget. The scheme can close when funding is committed. DAERA also requires applicants to wait for a final offer and submit the specified conditions and supporting documentation before starting operations.

The objective is to redesign woodland structure to strengthen species diversity and ecological value. Applicants must show how their proposed replanting improves woodland’s environmental value. All proposals must meet the UK Forestry Standard and associated guidance. The management plan must be valid for at least five years and cover at least the supported area. The booklet also sets out species proportions and open-space limits for the design.

## Species mix, open ground and climate resilience

No single species may account for more than 65% of a coupe. The proposal must include at least 5% native broadleaved trees or shrubs, 10% other tree species, and 10% open ground or ground managed primarily for biodiversity. Open space may not exceed 20%. These are minimum components, so they do not add up to 100%; the booklet says the remainder should reflect site conditions, surrounding diversity and woodland scale.

The proportions may be relaxed for regeneration coupes smaller than 10 hectares and for native woodland, provided adjacent land supplies landscape and habitat diversity. Flexibility may also be considered in larger woodland blocks or planned woodland under the applicant’s management. The wider block must be shown through the Forest Management Plan to meet the species-diversity requirements in the UK Forestry Standard. The relaxation is conditional rather than automatic.

The booklet requires species to be ecologically suitable for the biogeographic area or resilient to climate change, and not to threaten biodiversity or ecosystem services. The UK Forestry Standard framework requires proposals to consider site conditions, habitat features and watercourses, lakes, hedgerows and species-rich unimproved grassland, whether or not those features have formal protected-area status.

Design conditions also address the effects of new planting on nearby homes and land uses. The booklet sets a minimum 60-metre setback from dwellings; a 30-metre setback is accepted if written agreement from the occupier is submitted with the application. A 10-metre distance is required from other permanent roofed buildings, while temporary structures have no setback requirement. Open space can be incorporated to reduce loss of light or views and retain locally important sightlines.

## Environmental assessment and other land uses

Projects near, adjacent to or upstream of protected European nature sites may require a Habitats Regulations Assessment, depending on potential effects. Special Areas of Conservation and Special Protection Areas are considered separately in the application process. For Areas of Special Scientific Interest, potentially harmful operations must be notified to the Northern Ireland Environment Agency and relevant consent obtained; the booklet says this should happen before applying to the DAERA Forest Service.

Historic monuments and archaeological assets have separate requirements. Where planned work could directly affect a scheduled monument, applicants must contact the NIEA Historic Environment Division before applying. Planting near electricity lines also requires written notice to Northern Ireland Electricity Networks in advance. Support may not be available where clearance requirements conflict with sustainable forest management. Applicants should design tree placement and open areas with those infrastructure requirements in mind.

The grant cannot fund operations that conflict with or duplicate previous public support, including agricultural-environment schemes. The booklet recommends contacting the local agriculture office early if a forestry proposal may overlap with an agri-environment application. Cross-compliance conditions can apply to the grant area and the wider farming activity. They include protecting water and preventing pollution, preserving soil and carbon stocks, preventing erosion, and retaining habitats and landscape features.

Access rights, neighbouring owners’ interests, rights of way, traditional and cultural uses and nearby residents’ interests should also be considered in the woodland design. Project assessment is therefore not only about tree numbers and grant rate per hectare. The booklet recommends involving local councils, neighbours and land users with a recognisable interest in the proposal. Where woodland may surround a building on two or more sides, open-space design may be particularly important to preserve light and views.

## Claims, inspections and long-term obligations

Recipients must claim payment by the date in their offer letter; the booklet says this would normally be no later than 28 May 2027. Claims require original itemised invoices, cheques or equivalent evidence of payment, and bank statements showing payment to suppliers. After replanting, applicants must also submit a map or GPS survey showing the location of major species and open spaces. DAERA says late or incomplete claims may be reduced or penalised.

Forest Service inspections can be random, risk-based or targeted. The booklet says at least 5% of forestry-scheme claims must be checked each year and all schemes are subject to inspection. Inspectors review land boundaries in the application and payment claim, whether the work meets the required quantity and standard, and compliance with agreement terms. A claim that does not meet conditions may require remedial work or a payment reduction. False or misleading claims may be subject to the penalty system.

The agreement requires woodland to be maintained under good forestry practice for at least 20 years and not felled during that period; normal silvicultural thinning is treated separately. If land ownership changes, a successor may apply to take over an agreement under specified conditions, which can involve an inspection, forms and legal documents. If an applicant withdraws and does not transfer the agreement, DAERA may recover grants already paid with interest.

For force majeure or exceptional circumstances, applicants must notify the Department promptly if part of the woodland becomes unavailable and document why the event was outside their control. The booklet asks for written notification within 15 days of being able to report the event and says each case is considered individually. Separate procedures address the death of an agreement holder and transfers of ownership. These rules make the grant a long-term land-management commitment, not only a payment made at planting.

## How the booklet applies to applications

The booklet’s requirements combine environmental, financial and administrative planning. Species and open-space design, setbacks from homes and infrastructure, protected-site permissions, overlap with other land support and a long-term no-felling commitment are connected parts of a proposal. DAERA’s document explains how applications will be prepared and inspected; it does not report a list of new beneficiaries or the number of projects that have received payment.

Applicants must prepare management plans, maps and supporting documents in advance. Because projects are considered first come, first served until available funds are committed, timing also matters. Even so, applicants cannot start field work before receiving the offer letter. The sequence is intended to place environmental and administrative approval before the supported work and the evidence-based payment claim. Some permissions must be obtained before applying, so preparation goes beyond completing a DAERA form.

The publication page calls the document the Woodland Investment Grant Information Booklet 2026; the PDF itself focuses on the Restocking option. The payment rate and area thresholds therefore relate to that replanting option. The booklet does not say the same support applies to every form of agroforestry activity. Farmers are among the eligible applicants, but it does not promise automatic payment to every farmer or unconditional eligibility for every parcel of land.

## Data

### DAERA woodland restocking grant terms

Support rate, design thresholds and long-term conditions stated in the 2026 restocking booklet.

Methodology: Figures are transcribed from the DAERA PDF booklet published 23 October 2026; the support applies to the Restocking option described here.

| Item | Assessment |
|---|---|
| Restocking grant rate | £800 per hectare |
| Minimum application area | 1 hectare |
| Minimum coupe area | 0.2 hectares |
| Maximum share for one species | 65% of a coupe |
| Woodland commitment | Maintain for at least 20 years |

Sources: <https://www.daera-ni.gov.uk/sites/default/files/2026-10/Woodland%20Investment%20Grant%20-%20Information%20Booklet%202026_0.PDF> · Download data: [JSON](https://newsverum.com/api/v1/articles/daera-northern-ireland-woodland-investment-grant-restocking-terms-2026/data/daera-woodland-restocking-grant-rules-2026?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/daera-northern-ireland-woodland-investment-grant-restocking-terms-2026/data/daera-woodland-restocking-grant-rules-2026?lang=en&format=csv)

## Sources

- [Department of Agriculture, Environment and Rural Affairs](<https://www.daera-ni.gov.uk/publications/woodland-investment-grant-information-booklet-2026>) (Source checked: 2026-10-26; Published: 2026-10-23)
- [DAERA Woodland Investment Grant – Information Booklet 2026](<https://www.daera-ni.gov.uk/sites/default/files/2026-10/Woodland%20Investment%20Grant%20-%20Information%20Booklet%202026_0.PDF>) (Source checked: 2026-10-26; Published: 2026-10-23)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
