# Baluma Solar modification screened out of full environmental assessment

> Spain’s environmental authority decided that modifications to the 58.14 MW Baluma Solar installation in Granada do not require a full environmental impact assessment. The decision appeared in the BOE on 17 October.

- Canonical URL: https://newsverum.com/en/news/baluma-solar-granada-modification-environmental-screening
- Publisher: Newsverum
- Section: Environment
- Country: Spain
- Published: 2026-10-20T23:01:22+00:00
- Updated: 2026-10-20T23:01:22+00:00
- Event / data period: 2026-09-21
- Other editions: [Türkçe](https://newsverum.com/tr/news/baluma-solar-granada-modification-environmental-screening.md), [العربية](https://newsverum.com/ar/news/baluma-solar-granada-modification-environmental-screening.md), [Français](https://newsverum.com/fr/news/baluma-solar-granada-modification-environmental-screening.md), [Español](https://newsverum.com/es/news/baluma-solar-granada-modification-environmental-screening.md), [Deutsch](https://newsverum.com/de/news/baluma-solar-granada-modification-environmental-screening.md), [Português](https://newsverum.com/pt/news/baluma-solar-granada-modification-environmental-screening.md)

The change includes burying part of the 220 kV evacuation line near the Cubillas River. The selected route is about 1,152 metres long.

The screening outcome depends on compliance with the original project conditions and additional safeguards; it does not announce new construction or commissioning.

## Data

### Source and measure

Project information stated in the official source.

Methodology: The source states 58.14 MW as the installation’s capacity; this is not additional capacity created by the modification.

| Indicator | MW |
|---|---|
| Kurulu güç | 58.14 |

Sources: <https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21662> · Download data: [JSON](https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening/data/release-statistic?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/baluma-solar-granada-modification-environmental-screening/data/release-statistic?lang=en&format=csv)

## Sources

- [Boletín Oficial del Estado (BOE)](<https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-21662>) (Source checked: 2026-10-21; Published: 2026-10-17)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
