# Auriginal reports further gold-copper assays at Roger

> Four holes returned gold-copper assays; the 2026 estimate will exclude this year’s drilling.

- Canonical URL: https://newsverum.com/en/news/auriginal-roger-project-gold-copper-drill-assays-october-2026
- Publisher: Newsverum
- Section: Business
- Country: Canada
- Published: 2026-10-15T16:15:27+00:00
- Updated: 2026-10-15T16:15:27+00:00
- Event / data period: 2026-10-15
- Other editions: [Türkçe](https://newsverum.com/tr/news/auriginal-roger-project-gold-copper-drill-assays-october-2026.md), [العربية](https://newsverum.com/ar/news/auriginal-roger-project-gold-copper-drill-assays-october-2026.md), [Français](https://newsverum.com/fr/news/auriginal-roger-project-gold-copper-drill-assays-october-2026.md), [Español](https://newsverum.com/es/news/auriginal-roger-project-gold-copper-drill-assays-october-2026.md), [Deutsch](https://newsverum.com/de/news/auriginal-roger-project-gold-copper-drill-assays-october-2026.md), [Português](https://newsverum.com/pt/news/auriginal-roger-project-gold-copper-drill-assays-october-2026.md)

Auriginal Mining reported assays from four holes at its Roger project in Quebec’s Chibougamau district. Hole AUR-26-12 returned 45.5 metres grading 1.05 g/t gold from 397 metres down-hole, including 8.0 metres at 4.37 g/t and 2.2 metres at 12.2 g/t; the release also reported copper, silver and zinc in the narrower interval.

The company said the 2026 mineral-resource estimate expected before year-end will exclude this year’s drilling and reset the historical estimate using a revised interpretation and modern database. A later update incorporating 2026 drilling was targeted for the first half of 2027; reported down-hole lengths are not necessarily true widths, and the results do not establish added resources.

## Data

### Reported figures

Project figures stated in the release.

Methodology: Company-reported figures; the sampling, drilling and planning limits stated in the source apply.

| Measure | Value | Unit |
|---|---|---|
| AUR-26-12 gold interval | 45.5 | metres |
| AUR-26-10 gold interval | 29.4 | metres |
| Approximate Phase 2 drilling | 5700 | metres |

Sources: <https://www.newsfilecorp.com/release/319019/Auriginal-Intersects-45.5-m-of-1.05-gt-Au-and-29.4-m-of-1.32-gt-Au-at-Roger-Extending-GoldCopper-Mineralization-at-Depth-Updated-Mineral-Resource-Estimate-Expected-Before-YearEnd-2026> · Download data: [JSON](https://newsverum.com/api/v1/articles/auriginal-roger-project-gold-copper-drill-assays-october-2026/data/reported-figures-1?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/auriginal-roger-project-gold-copper-drill-assays-october-2026/data/reported-figures-1?lang=en&format=csv)

### Reported figures

Project figures stated in the release.

Methodology: Company-reported figures; the sampling, drilling and planning limits stated in the source apply.

| Measure | Value | Unit |
|---|---|---|
| AUR-26-12 gold grade | 1.05 | g/t |
| AUR-26-10 gold grade | 1.32 | g/t |

Sources: <https://www.newsfilecorp.com/release/319019/Auriginal-Intersects-45.5-m-of-1.05-gt-Au-and-29.4-m-of-1.32-gt-Au-at-Roger-Extending-GoldCopper-Mineralization-at-Depth-Updated-Mineral-Resource-Estimate-Expected-Before-YearEnd-2026> · Download data: [JSON](https://newsverum.com/api/v1/articles/auriginal-roger-project-gold-copper-drill-assays-october-2026/data/reported-figures-2?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/auriginal-roger-project-gold-copper-drill-assays-october-2026/data/reported-figures-2?lang=en&format=csv)

## Sources

- [Auriginal Mining Corp. (Newsfile)](<https://www.newsfilecorp.com/release/319019/Auriginal-Intersects-45.5-m-of-1.05-gt-Au-and-29.4-m-of-1.32-gt-Au-at-Roger-Extending-GoldCopper-Mineralization-at-Depth-Updated-Mineral-Resource-Estimate-Expected-Before-YearEnd-2026>) (Source checked: 2026-10-15; Published: 2026-10-15)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
