# ASML starts building Eindhoven campus with capacity for up to 20,000 workplaces

> The company says Brainport Industries Campus North will eventually span about 350,000 square metres

- Canonical URL: https://newsverum.com/en/news/asml-starts-eindhoven-campus-construction-with-potential-20000-workplaces
- Publisher: Newsverum
- Section: Technology
- Country: Netherlands
- Published: 2026-10-07T21:41:38+00:00
- Updated: 2026-10-07T21:41:38+00:00
- Event / data period: 2026-09-08
- Other editions: [Türkçe](https://newsverum.com/tr/news/asml-starts-eindhoven-campus-construction-with-potential-20000-workplaces.md), [العربية](https://newsverum.com/ar/news/asml-starts-eindhoven-campus-construction-with-potential-20000-workplaces.md), [Français](https://newsverum.com/fr/news/asml-starts-eindhoven-campus-construction-with-potential-20000-workplaces.md), [Español](https://newsverum.com/es/news/asml-starts-eindhoven-campus-construction-with-potential-20000-workplaces.md), [Deutsch](https://newsverum.com/de/news/asml-starts-eindhoven-campus-construction-with-potential-20000-workplaces.md), [Português](https://newsverum.com/pt/news/asml-starts-eindhoven-campus-construction-with-potential-20000-workplaces.md)

ASML said it began construction of Brainport Industries Campus North near Eindhoven with a groundbreaking ceremony on 8 September. The company said the project would add manufacturing capacity in support of its planned growth.

ASML expects the first phase to be completed in 2029 and house at least 3,000 employees, primarily relocated from existing sites. The long-term site could accommodate up to 20,000 workplaces; the company did not describe these as new jobs.

## Data

### ASML Brainport Industries Campus North in Eindhoven, company plans

Phased campus development announced by ASML; capacity and schedule are company expectations

Methodology: ASML-announced campus project in Eindhoven: potential long-term capacity; workplaces are not equivalent to new jobs.

| label | value | unit | period | basis | value_qualifier |
|---|---|---|---|---|---|
| Long-term campus workplace capacity | 20000 | count | 2026-09-08 | target | upper-bound |
| Area of the campus development | 350000 | square metres | 2026-09-08 | target | approximate |

Sources: <https://investor.asml.com/news-releases/news-release-details/asml-begins-construction-new-eindhoven-campus-strengthening-its-presence-brainport-region> · Download data: [JSON](https://newsverum.com/api/v1/articles/asml-starts-eindhoven-campus-construction-with-potential-20000-workplaces/data/reported-figures?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/asml-starts-eindhoven-campus-construction-with-potential-20000-workplaces/data/reported-figures?lang=en&format=csv)

## Sources

- [ASML Holding N.V.](<https://investor.asml.com/news-releases/news-release-details/asml-begins-construction-new-eindhoven-campus-strengthening-its-presence-brainport-region>) (Source checked: 2026-10-07; Published: 2026-09-08)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
