# Source not verified: ANEEL rule sets 18-month transition before hydro curtailment-cost allocation

> Source not verified: CPG’s 10 October report describes Resolution 1,170 published on 9 October; the official text could not be accessed for this review.

- Canonical URL: https://newsverum.com/en/news/aneel-curtailment-allocation-phase-in-ren-1170-2026
- Publisher: Newsverum
- Section: Energy
- Country: Brazil
- Published: 2026-10-10T21:53:06+00:00
- Updated: 2026-10-10T21:53:06+00:00
- Event / data period: 2026-10-09
- Other editions: [Türkçe](https://newsverum.com/tr/news/aneel-curtailment-allocation-phase-in-ren-1170-2026.md), [العربية](https://newsverum.com/ar/news/aneel-curtailment-allocation-phase-in-ren-1170-2026.md), [Français](https://newsverum.com/fr/news/aneel-curtailment-allocation-phase-in-ren-1170-2026.md), [Español](https://newsverum.com/es/news/aneel-curtailment-allocation-phase-in-ren-1170-2026.md), [Deutsch](https://newsverum.com/de/news/aneel-curtailment-allocation-phase-in-ren-1170-2026.md), [Português](https://newsverum.com/pt/news/aneel-curtailment-allocation-phase-in-ren-1170-2026.md)

Source not verified: Click Petróleo e Gás (CPG) reported on 10 October 2026 that ANEEL’s Regulatory Resolution 1,170 was published in Brazil’s official gazette on 9 October. CPG says it was signed on 6 October. The official ANEEL PDF and gazette link could not be accessed for this review, so the provisions below follow CPG’s account.

According to CPG, non-reservoir hydro plants with turbine-spill availability enter the financial curtailment allocation after an 18-month transition, in 25%, 50%, 75% and 100% phases. Eligible wind and solar plants share the remaining allocation during that phase-in. The rule does not guarantee a compensation amount for any generator or less physical curtailment; no conclusion about consumer tariffs follows.

## Data

### Source not verified: Scope of ANEEL Resolution 1,170

Methodology: Source not verified: ANEEL’s original PDF could not be accessed for this review. Phases are attributed to CPG’s 10 October report; they are not physical generation cuts, compensation amounts or tariff outcomes. Geography: Brazil.

| Text in Turkish | Text in English | Text in Arabic | Text in French | Text in Spanish | Text in German | Text in Portuguese |
|---|---|---|---|---|---|---|
| Kaynak doğrulanmadı: CPG’nin aktardığı 18 aylık finansal dağıtım aşamaları: %25, %50, %75 ve %100; belirli ödeme veya üretim kısıntısı garantisi yoktur. | Source not verified: CPG reports 18-month financial-allocation phases of 25%, 50%, 75% and 100%; no payment or physical-curtailment outcome is guaranteed. | لم يتم التحقق من المصدر: يذكر تقرير CPG مراحل توزيع مالي على مدى 18 شهراً: 25% و50% و75% و100%؛ ولا يوجد ضمان للدفع أو لنتيجة تقليص الإنتاج فعلياً. | Source non vérifiée : CPG rapporte des phases de répartition financière sur 18 mois : 25 %, 50 %, 75 % et 100 % ; aucun paiement ni résultat physique de réduction n’est garanti. | Fuente no verificada: CPG describe fases de reparto financiero durante 18 meses: 25%, 50%, 75% y 100%; no se garantiza pago ni reducción física. | Quelle nicht verifiziert: CPG nennt Phasen der finanziellen Verteilung über 18 Monate: 25 %, 50 %, 75 % und 100 %; Zahlung oder physische Kürzung sind nicht garantiert. | Fonte não verificada: a CPG refere fases de repartição financeira ao longo de 18 meses: 25%, 50%, 75% e 100%; não há garantia de pagamento ou de redução física. |

Sources: <https://clickpetroleoegas.com.br/hidreletricas-sem-reservatorio-so-vao-rachar-25-do-corte-de-geracao-depois-de-18-meses-e-eolicas-e-solares-ficam-com-o-resto-a-nova-regra-da-aneel-btl96/> · Download data: [JSON](https://newsverum.com/api/v1/articles/aneel-curtailment-allocation-phase-in-ren-1170-2026/data/aneel-curtailment-allocation-phase-in-ren-1170-2026-scope?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/aneel-curtailment-allocation-phase-in-ren-1170-2026/data/aneel-curtailment-allocation-phase-in-ren-1170-2026-scope?lang=en&format=csv)

## Sources

- [Click Petróleo e Gás (CPG)](<https://clickpetroleoegas.com.br/hidreletricas-sem-reservatorio-so-vao-rachar-25-do-corte-de-geracao-depois-de-18-meses-e-eolicas-e-solares-ficam-com-o-resto-a-nova-regra-da-aneel-btl96/>) (Source checked: 2026-10-10; Published: 2026-10-10)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
