# American Pacific plans downhole surveys at Montana’s Madison project

> Imaging and geophysical measurements following earlier M26C-02 results are intended to guide possible step-out drilling.

- Canonical URL: https://newsverum.com/en/news/american-pacific-plans-madison-downhole-surveys-montana
- Publisher: Newsverum
- Section: Business
- Country: United States
- Published: 2026-10-07T12:59:35+00:00
- Updated: 2026-10-07T12:59:35+00:00
- Event / data period: 2026-10-06
- Other editions: [Türkçe](https://newsverum.com/tr/news/american-pacific-plans-madison-downhole-surveys-montana.md), [العربية](https://newsverum.com/ar/news/american-pacific-plans-madison-downhole-surveys-montana.md), [Français](https://newsverum.com/fr/news/american-pacific-plans-madison-downhole-surveys-montana.md), [Español](https://newsverum.com/es/news/american-pacific-plans-madison-downhole-surveys-montana.md), [Deutsch](https://newsverum.com/de/news/american-pacific-plans-madison-downhole-surveys-montana.md), [Português](https://newsverum.com/pt/news/american-pacific-plans-madison-downhole-surveys-montana.md)

American Pacific Mining said on October 6 that it had engaged Colog to conduct downhole structural and geophysical surveys in hole M26C-02 at the Madison copper-gold project in Montana. The work is intended to better define the orientation and geological controls of mineralization reported in September.

The program includes acoustic and optical televiewer imaging; the company may also add resistivity and conductivity measurements. Results are intended to guide planned step-out holes toward the west-southwest. The previously reported 30.8-metre intersection is a downhole length, and its true width has not been determined.

## Data

### Downhole length of the earlier Madison intersection

Length along the drill hole of the M26C-02 intersection reported by the company in September.

Methodology: This is not true width; the company said true width has not yet been determined.

| label | value | unit | period | basis | value_qualifier |
|---|---|---|---|---|---|
| Downhole length of the M26C-02 intersection | 30.8 | metres | 2026-10-06 | observed | exact |

Sources: <https://americanpacificmining.com/news-releases-2026/american-pacific-plans-downhole-surveys-to-guide-step-out-drilling-at-high-grade-massive-sulfide-zone/> · Download data: [JSON](https://newsverum.com/api/v1/articles/american-pacific-plans-madison-downhole-surveys-montana/data/release-figures?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/american-pacific-plans-madison-downhole-surveys-montana/data/release-figures?lang=en&format=csv)

## Sources

- [American Pacific Mining Corp.](<https://americanpacificmining.com/news-releases-2026/american-pacific-plans-downhole-surveys-to-guide-step-out-drilling-at-high-grade-massive-sulfide-zone/>) (Source checked: 2026-10-07; Published: 2026-10-06)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
