# Afghanistan seeks technical review of Dahla Dam raising design

> Consultancy scope includes spillways and saddle dams.

- Canonical URL: https://newsverum.com/en/news/afghanistan-seeks-technical-review-of-dahla-dam-raising-design
- Publisher: Newsverum
- Section: Energy
- Published: 2026-10-02T21:09:51+03:00
- Updated: 2026-10-07T00:52:23+03:00
- Event / data period: 2026-09
- Other editions: [Türkçe](https://newsverum.com/tr/news/afghanistan-seeks-technical-review-of-dahla-dam-raising-design.md), [العربية](https://newsverum.com/ar/news/afghanistan-seeks-technical-review-of-dahla-dam-raising-design.md), [Français](https://newsverum.com/fr/news/afghanistan-seeks-technical-review-of-dahla-dam-raising-design.md), [Español](https://newsverum.com/es/news/afghanistan-seeks-technical-review-of-dahla-dam-raising-design.md), [Deutsch](https://newsverum.com/de/news/afghanistan-seeks-technical-review-of-dahla-dam-raising-design.md), [Português](https://newsverum.com/pt/news/afghanistan-seeks-technical-review-of-dahla-dam-raising-design.md)

Afghanistan’s Energy and Water Ministry sought expressions of interest for review, verification and technical certification of Dahla Dam raising design, covering two spillway packages and six saddle dams.

The listed deadline for MOWE/1405/ICB/C-2755 was September 22, 2026, defining this report’s September reference period. This consultancy notice does not announce completed raising works or a selected contractor.

## Sources

- [Afghanistan Ministry of Energy and Water](<https://mew.gov.af/dr/request-expression-interest-4>) (Source checked: 2026-10-02)

## Correction history

- 2026-10-06T21:55:54+03:00: The missing language translations for this article have been added.
- 2026-10-07T00:52:23+03:00: German and Portuguese editions and translations of the data and correction explanations have been added to this article.

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
