# AECOM selected to design Silicon Valley direct potable reuse pilot facility

> AECOM said the Santa Clara Valley Water District selected it to provide design services for the Pure Water Silicon Valley demonstration facility, a pilot able to produce up to 200 gallons per minute.

- Canonical URL: https://newsverum.com/en/news/aecom-valley-water-pure-water-silicon-valley-demonstration-facility-design-september-2026
- Publisher: Newsverum
- Section: Infrastructure
- Country: United States
- Published: 2026-10-05T09:37:37+00:00
- Updated: 2026-10-07T00:54:58+03:00
- Event / data period: 2026-09-03
- Other editions: [Türkçe](https://newsverum.com/tr/news/aecom-valley-water-pure-water-silicon-valley-demonstration-facility-design-september-2026.md), [العربية](https://newsverum.com/ar/news/aecom-valley-water-pure-water-silicon-valley-demonstration-facility-design-september-2026.md), [Français](https://newsverum.com/fr/news/aecom-valley-water-pure-water-silicon-valley-demonstration-facility-design-september-2026.md), [Español](https://newsverum.com/es/news/aecom-valley-water-pure-water-silicon-valley-demonstration-facility-design-september-2026.md), [Deutsch](https://newsverum.com/de/news/aecom-valley-water-pure-water-silicon-valley-demonstration-facility-design-september-2026.md), [Português](https://newsverum.com/pt/news/aecom-valley-water-pure-water-silicon-valley-demonstration-facility-design-september-2026.md)

On 3 September 2026, AECOM announced its selection by the Santa Clara Valley Water District (Valley Water) to provide professional design services for the Pure Water Silicon Valley Demonstration Facility Project in California. AECOM said the project will help advance direct potable reuse as a potential future source of locally controlled, drought-resilient drinking water for Silicon Valley.

Under the contract, AECOM will lead the design of a new direct potable reuse pilot facility and a LEED-certified, solar-ready learning center at the existing Silicon Valley Advanced Water Purification Center site. The pilot facility will be able to produce up to 200 gallons per minute and will evaluate advanced treatment technologies, while the learning center of approximately 10,000 square feet will support public education, community engagement and workforce development.

AECOM’s scope includes project management and coordination, pilot facility design and engineering, architecture and building engineering for the learning center, regulatory and permitting support, public outreach assistance, and quality assurance and control. It will work alongside Kennedy Jenks and other subconsultants. The announcement covers design services only and does not state a contract value or name a construction contractor.

## Data

### Pilot facility and learning center figures

Pilot facility capacity and learning center area stated in AECOM’s announcement.

Methodology: Both figures describe facilities to be designed, not built capacity. The pilot capacity is an upper limit (“up to”) and the learning center area is approximate. The announcement does not disclose a contract value.

| label | value | unit | period | basis | value_qualifier |
|---|---|---|---|---|---|
| Pilot facility production capacity (up to) | 200 | gallons per minute | 2026-09-03 | target | upper-bound |
| Learning center floor area (approximate) | 10000 | square feet | 2026-09-03 | target | approximate |

Sources: <https://aecom.com/press-releases/aecom-selected-to-design-pure-water-silicon-valley-demonstration-facility/> · Download data: [JSON](https://newsverum.com/api/v1/articles/aecom-valley-water-pure-water-silicon-valley-demonstration-facility-design-september-2026/data/pilot-facility-figures?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/aecom-valley-water-pure-water-silicon-valley-demonstration-facility-design-september-2026/data/pilot-facility-figures?lang=en&format=csv)

## Sources

- [AECOM](<https://aecom.com/press-releases/aecom-selected-to-design-pure-water-silicon-valley-demonstration-facility/>) (Source checked: 2026-10-04; Published: 2026-09-03)

## Correction history

- 2026-10-07T00:54:58+03:00: German and Portuguese editions and translations of the data and correction explanations have been added to this article.

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
