# Abu Dhabi plans 13-kilometre road upgrade in Mussafah

> DMT plans to upgrade about 13 kilometres of road along E30 and 8th Street in Mussafah.

- Canonical URL: https://newsverum.com/en/news/abu-dhabi-mussafah-road-upgrade-2026
- Publisher: Newsverum
- Section: Infrastructure
- Country: United Arab Emirates
- Published: 2026-10-20T14:20:10+00:00
- Updated: 2026-10-20T14:20:10+00:00
- Event / data period: 2026-10-11
- Other editions: [Türkçe](https://newsverum.com/tr/news/abu-dhabi-mussafah-road-upgrade-2026.md), [العربية](https://newsverum.com/ar/news/abu-dhabi-mussafah-road-upgrade-2026.md), [Français](https://newsverum.com/fr/news/abu-dhabi-mussafah-road-upgrade-2026.md), [Español](https://newsverum.com/es/news/abu-dhabi-mussafah-road-upgrade-2026.md), [Deutsch](https://newsverum.com/de/news/abu-dhabi-mussafah-road-upgrade-2026.md), [Português](https://newsverum.com/pt/news/abu-dhabi-mussafah-road-upgrade-2026.md)

Abu Dhabi’s Department of Municipalities and Transport (DMT) announced on 11 October a planned upgrade covering about 13 kilometres along E30 and 8th Street in Mussafah. The project is intended to improve traffic flow, safety and journey times on routes linking the industrial area with Mohamed Bin Zayed City and Zayed City.

The plan includes a free-flowing highway on 8th Street with three lanes in each direction, alongside lanes for local access. DMT said the road is expected to accommodate about 4,000 vehicles per hour. Other planned works cover four interchanges on E30 and nine key junctions, as well as two bridges between Mussafah and Mohamed Bin Zayed City and a separate pedestrian bridge.

## Data

### Project scope and route length

Route length for the planned road works reported by DMT.

Methodology: The block records the source’s approximate route length and planned road capacity. These are project estimates, not completed construction or observed traffic measurements.

| label | value | unit | period | basis | value_qualifier |
|---|---|---|---|---|---|
| Planned route | 13 | km | 2026-10-11 | target | approximate |
| Estimated capacity: 8th Street highway | 4000 | vehicles per hour | 2026-10-11 | target | approximate |

Sources: <https://www.wam.ae/en/article/c2otst3-department-municipalities-transport-launches> · Download data: [JSON](https://newsverum.com/api/v1/articles/abu-dhabi-mussafah-road-upgrade-2026/data/mussafah-road-upgrade-project-scope?lang=en&format=json) · [CSV](https://newsverum.com/api/v1/articles/abu-dhabi-mussafah-road-upgrade-2026/data/mussafah-road-upgrade-project-scope?lang=en&format=csv)

## Sources

- [Emirates News Agency](<https://www.wam.ae/en/article/c2otst3-department-municipalities-transport-launches>) (Source checked: 2026-10-20; Published: 2026-10-11)

---

Cite the canonical URL above. [Editorial standards and corrections](https://newsverum.com/en/editorial)
